Saunderson PRV Lower Townsite Supply Lines HDD

The Saunderson PRV project is a multi-year project to upgrade water supply for the Lower Townsite (LTS) neighbourhood in Fort McMurray, Alberta. The project includes the construction of a new PRV chamber, extension of the existing primary high pressure water supply line, and the installation of a new supply line from the existing LTS Reservoir in the Abasand Heights neighborhood to the new PRV chamber by horizontal directional drilling (HDD). The focus of this paper is on the design and installation of the 445 m long and 914 mm diameter HDPE DR9 directionally drilled supply line crossing of Highway 63 from the LTS to the Abasand Heights plateau, a topographic elevation difference of approximately 65 m between entry and exit. Project complexities resulting from the elevation difference between drill entry and exit included risk of flush-backs during reaming passes, overbreak pipe support for pullback, buoyancy control requirements during pullback, and annular space grouting post-installation.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.055
Primary Topic
Urban and Freight Transport Logistics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Saunderson PRV Lower Townsite Supply Lines HDD

Jason S. Lueke, Mason Ross, Chris Lamont, Sam Saunders
Urban and Freight Transport Logistics
article

Saunderson PRV Lower Townsite Supply Lines HDD

Jason S. Lueke, Mason Ross, Chris Lamont, Sam Saunders
article en

Abstract

The Saunderson PRV project is a multi-year project to upgrade water supply for the Lower Townsite (LTS) neighbourhood in Fort McMurray, Alberta. The project includes the construction of a new PRV chamber, extension of the existing primary high pressure water supply line, and the installation of a new supply line from the existing LTS Reservoir in the Abasand Heights neighborhood to the new PRV chamber by horizontal directional drilling (HDD). The focus of this paper is on the design and installation of the 445 m long and 914 mm diameter HDPE DR9 directionally drilled supply line crossing of Highway 63 from the LTS to the Abasand Heights plateau, a topographic elevation difference of approximately 65 m between entry and exit. Project complexities resulting from the elevation difference between drill entry and exit included risk of flush-backs during reaming passes, overbreak pipe support for pullback, buoyancy control requirements during pullback, and annular space grouting post-installation.

Associated Research (United States) (US)
Openalex Percentile: Top 85%
Urban and Freight Transport Logistics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Saunderson PRV Lower Townsite Supply Lines HDD — Jason S. Lueke, Mason Ross, et al. · (2024) | TGRS Research Map | TGRS