Fast Action to a Small Leak Avoids Possible Catastrophic Failure of a Large-Diameter Transmission Main

In January 2023, MWCo detected a leak on a 48-in. PCCP within a 4.38-mi long transmission main that conveys potable water from MWCo’s 60 MGD CJO WTP to their distribution system. The leak was detected within an existing easement adjacent to a major highway in the Township of Edison, NJ. In order to assess the cause and extent of this leak, MWCo shutdown the pipeline for an emergency repair and used this as an opportunity to perform a more detailed condition assessment of a portion of this transmission main. This opportunistic inspection consisted of a visual, sounding, and electromagnetic inspection of approximately 5,500 LF of the pipeline to evaluate distress and recommend pipes for repair. Based on these results and recommendations, MWCo elected to repair approximately 1,655 LF of the pipeline using CFRP. This paper presents the importance of the efficient application of specialty inspection, analysis, design of repairs, and implementation of these repairs. This proactive, comprehensive condition assessment and repair approach prevented possible catastrophic failure and should prevent future leaks and maintain the reliability of this transmission main for years to come.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.059
Primary Topic
Engineering and Test Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fast Action to a Small Leak Avoids Possible Catastrophic Failure of a Large-Diameter Transmission Main

Rasko P. Ojdrovic, Jan Chwiedosiuk, David J. Tanzi, Kristen A. Peterson
Engineering and Test Systems
article

Fast Action to a Small Leak Avoids Possible Catastrophic Failure of a Large-Diameter Transmission Main

Rasko P. Ojdrovic, Jan Chwiedosiuk, David J. Tanzi, Kristen A. Peterson
article en

Abstract

In January 2023, MWCo detected a leak on a 48-in. PCCP within a 4.38-mi long transmission main that conveys potable water from MWCo’s 60 MGD CJO WTP to their distribution system. The leak was detected within an existing easement adjacent to a major highway in the Township of Edison, NJ. In order to assess the cause and extent of this leak, MWCo shutdown the pipeline for an emergency repair and used this as an opportunity to perform a more detailed condition assessment of a portion of this transmission main. This opportunistic inspection consisted of a visual, sounding, and electromagnetic inspection of approximately 5,500 LF of the pipeline to evaluate distress and recommend pipes for repair. Based on these results and recommendations, MWCo elected to repair approximately 1,655 LF of the pipeline using CFRP. This paper presents the importance of the efficient application of specialty inspection, analysis, design of repairs, and implementation of these repairs. This proactive, comprehensive condition assessment and repair approach prevented possible catastrophic failure and should prevent future leaks and maintain the reliability of this transmission main for years to come.

Simpson College (US), RED Consulting (Norway) (NO), CDM Smith (United States) (US), Middlesex University Malta (MT)
Climate action
Openalex Percentile: Top 85%
Engineering and Test Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.