Valley Line West LRT: Drainage Relocation—Microtunneling Construction Impact on Existing Infrastructure Using Finite Element Analysis

Design and construction on the new Valley Line West LRT which connects downtown to the west side of Edmonton are currently underway. EPCOR owns and operates a number of sanitary sewers along the new LRT alignment. Due to the location, depth, length, and other utility conflicts, the primary sewer was designed to be replaced primarily by microtunneling methods as it will conflict with the new LRT alignment. Shanghai Construction Group was awarded the project and began planning for the work. Due to the tight construction timeline, two drives were planned to occur simultaneously from both sides of an existing 1,500 mm diameter trunk at installation lengths between 400 m and 990 m. The anticipated jacking loads for the installations were identified as a concern as the existing deep trunk was not designed to take the laterally imposed 500 and 1,000 t. A finite element analysis of the proposed shaft design system and the loading imposed by the microtunneling was completed to determine if the potential impacts to the existing tunnel were in excess of what could be resisted. This paper discusses the steps taken to assess the structural impact of the construction loads on the existing deep sewer trunk.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.005
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Valley Line West LRT: Drainage Relocation—Microtunneling Construction Impact on Existing Infrastructure Using Finite Element Analysis

Yang Bai, Jason S. Lueke, Tamer Elshimi, Chris Lamont et al.
Geotechnical Engineering and Underground Structures
article

Valley Line West LRT: Drainage Relocation—Microtunneling Construction Impact on Existing Infrastructure Using Finite Element Analysis

Yang Bai, Jason S. Lueke, Tamer Elshimi, Chris Lamont, Alex Mather, Shiva Maharjan
article en

Abstract

Design and construction on the new Valley Line West LRT which connects downtown to the west side of Edmonton are currently underway. EPCOR owns and operates a number of sanitary sewers along the new LRT alignment. Due to the location, depth, length, and other utility conflicts, the primary sewer was designed to be replaced primarily by microtunneling methods as it will conflict with the new LRT alignment. Shanghai Construction Group was awarded the project and began planning for the work. Due to the tight construction timeline, two drives were planned to occur simultaneously from both sides of an existing 1,500 mm diameter trunk at installation lengths between 400 m and 990 m. The anticipated jacking loads for the installations were identified as a concern as the existing deep trunk was not designed to take the laterally imposed 500 and 1,000 t. A finite element analysis of the proposed shaft design system and the loading imposed by the microtunneling was completed to determine if the potential impacts to the existing tunnel were in excess of what could be resisted. This paper discusses the steps taken to assess the structural impact of the construction loads on the existing deep sewer trunk.

University of Alberta (CA)
Industry, innovation and infrastructure
Openalex Percentile: Top 84%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.