Transitioning Away from Collection System Concrete Structures

This paper discusses how the designer and owner addressed operational and maintenance challenges of a sewer system built over 32 years ago. The existing 16,000 linear feet (LF) of 27-in. reinforced concrete pipe (RCP) interceptor sewer has experienced collapses due to hydrogen sulfide corrosion. Preliminary engineering included condition assessment, hydraulic analysis, and cost–benefit alternative analysis. Replacement of the interceptor includes a segment of the pipeline that crosses a tributary to the Red Oak Creek. The existing crossing at this location is an encased aerial system with supporting piers on both ends. Design of a new tributary aerial crossing revealed that an encased 48-in. carrier pipe would backup stormwater flow in the tributary channel because of a new lower flow line, which would require a new, long easement for grading upstream. An alternative to the aerial crossing would be a siphon design that traditionally would use concrete structures on either end. Due to the owner’s operational and maintenance challenges associated with concrete siphon structures, an alternate solution to a traditional siphon design was developed in the form of a siphon with FRP wye manifolds.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485569.064
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Transitioning Away from Collection System Concrete Structures

Brad T. Pierce, Vibhuti Pandey, Barton T. Hubbard, Dusty D. Brannum
Infrastructure Maintenance and Monitoring
article

Transitioning Away from Collection System Concrete Structures

Brad T. Pierce, Vibhuti Pandey, Barton T. Hubbard, Dusty D. Brannum
article en

Abstract

This paper discusses how the designer and owner addressed operational and maintenance challenges of a sewer system built over 32 years ago. The existing 16,000 linear feet (LF) of 27-in. reinforced concrete pipe (RCP) interceptor sewer has experienced collapses due to hydrogen sulfide corrosion. Preliminary engineering included condition assessment, hydraulic analysis, and cost–benefit alternative analysis. Replacement of the interceptor includes a segment of the pipeline that crosses a tributary to the Red Oak Creek. The existing crossing at this location is an encased aerial system with supporting piers on both ends. Design of a new tributary aerial crossing revealed that an encased 48-in. carrier pipe would backup stormwater flow in the tributary channel because of a new lower flow line, which would require a new, long easement for grading upstream. An alternative to the aerial crossing would be a siphon design that traditionally would use concrete structures on either end. Due to the owner’s operational and maintenance challenges associated with concrete siphon structures, an alternate solution to a traditional siphon design was developed in the form of a siphon with FRP wye manifolds.

Vol. 230
Education Authority (GB), Jacobs (United States) (US), Financial Services Authority (GB)
Sustainable cities and communities
Openalex Percentile: Top 84%
Infrastructure Maintenance and Monitoring
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.