Transitioning Away from Collection System Concrete Structures
This paper discusses how the designer and owner addressed operational and maintenance challenges of a sewer system built over 32 years ago. The existing 16,000 linear feet (LF) of 27-in. reinforced concrete pipe (RCP) interceptor sewer has experienced collapses due to hydrogen sulfide corrosion. Preliminary engineering included condition assessment, hydraulic analysis, and cost–benefit alternative analysis. Replacement of the interceptor includes a segment of the pipeline that crosses a tributary to the Red Oak Creek. The existing crossing at this location is an encased aerial system with supporting piers on both ends. Design of a new tributary aerial crossing revealed that an encased 48-in. carrier pipe would backup stormwater flow in the tributary channel because of a new lower flow line, which would require a new, long easement for grading upstream. An alternative to the aerial crossing would be a siphon design that traditionally would use concrete structures on either end. Due to the owner’s operational and maintenance challenges associated with concrete siphon structures, an alternate solution to a traditional siphon design was developed in the form of a siphon with FRP wye manifolds.
Authors
- Brad T. Pierce
- Vibhuti Pandey
- Barton T. Hubbard
- Dusty D. Brannum
Institutions
- Education Authority (GB)
- Jacobs (United States) (US)
- Financial Services Authority (GB)
Publication Details
- Published
- 2024-08-30
- DOI
- https://doi.org/10.1061/9780784485569.064
- Primary Topic
- Infrastructure Maintenance and Monitoring
- Type
- article
- Field-Weighted Citation Impact
- 0.00