Utilizing Existing Resources: Rehabilitation of 72″ Steel Lock-Bar Pipe

The Western Bays of Long Island New York were once a productive fishing area. Much of the excess nitrogen in the Bay is attributed to wastewater treatment facilities that discharge directly into the Bays. In an effort to improve the marsh’s ecosystem, the New York State Department of Environmental Conservation (NYSDEC) and Nassau County Department of Public Works entered into a unique partnership to implement a Design–Build project that would remove up to 90% of the nitrogen loading in an already compromised area. Up to 75 million gallons per day (MGD) of wet and dry weather flow needed to be diverted from the Bay Park Sewage Treatment Plant (BPSTP) to the Cedar Creek Water Pollution Control Plant (CCWPCP) to be discharged via the existing ocean outfall at that site. This Bay Park Conveyance Project would require the construction of a 12.4-mi long force main from the South Shore Water Reclamation Facility to the existing Cedar Creek Water Pollution Control Plant (WPCP) outfall. The plan was to utilize 7.3 mi of an existing abandoned 72″ steel lock-bar pipe. This aqueduct would require full rehabilitation of the existing pipeline. The preliminary design for the 72″ pipeline was to rehabilitate the pipe by sliplining with Fiberglass Reinforced Polymer Mortar (FRPM) pipe or Steel pipe. Carbon Fiber Reinforced Polymer (CFRP) lining would be considered, but on very limited sections of pipeline due to installation cost and efficiency. The design criteria developed provided the basis for the system design, including appropriate standards, Mandatory Requirement for performance and/or materials, and product specifications. This paper will review this project in detail from cradle to grave covering aspects from the background with initial design parameters and to the process of final design and construction completion. Included in this presentation will also be lessons learned throughout the design and construction process.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.048
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Utilizing Existing Resources: Rehabilitation of 72″ Steel Lock-Bar Pipe

Jorge-Luis Pérez-Medina, Jeffrey LeBlanc, Carl Pitzer, G. Martínez Gutiérrez
Geotechnical Engineering and Underground Structures
article

Utilizing Existing Resources: Rehabilitation of 72″ Steel Lock-Bar Pipe

Jorge-Luis Pérez-Medina, Jeffrey LeBlanc, Carl Pitzer, G. Martínez Gutiérrez
article en

Abstract

The Western Bays of Long Island New York were once a productive fishing area. Much of the excess nitrogen in the Bay is attributed to wastewater treatment facilities that discharge directly into the Bays. In an effort to improve the marsh’s ecosystem, the New York State Department of Environmental Conservation (NYSDEC) and Nassau County Department of Public Works entered into a unique partnership to implement a Design–Build project that would remove up to 90% of the nitrogen loading in an already compromised area. Up to 75 million gallons per day (MGD) of wet and dry weather flow needed to be diverted from the Bay Park Sewage Treatment Plant (BPSTP) to the Cedar Creek Water Pollution Control Plant (CCWPCP) to be discharged via the existing ocean outfall at that site. This Bay Park Conveyance Project would require the construction of a 12.4-mi long force main from the South Shore Water Reclamation Facility to the existing Cedar Creek Water Pollution Control Plant (WPCP) outfall. The plan was to utilize 7.3 mi of an existing abandoned 72″ steel lock-bar pipe. This aqueduct would require full rehabilitation of the existing pipeline. The preliminary design for the 72″ pipeline was to rehabilitate the pipe by sliplining with Fiberglass Reinforced Polymer Mortar (FRPM) pipe or Steel pipe. Carbon Fiber Reinforced Polymer (CFRP) lining would be considered, but on very limited sections of pipeline due to installation cost and efficiency. The design criteria developed provided the basis for the system design, including appropriate standards, Mandatory Requirement for performance and/or materials, and product specifications. This paper will review this project in detail from cradle to grave covering aspects from the background with initial design parameters and to the process of final design and construction completion. Included in this presentation will also be lessons learned throughout the design and construction process.

Prairie Bible Institute (CA)
Industry, innovation and infrastructure
Openalex Percentile: Top 84%
Geotechnical Engineering and Underground Structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.