Advancements in Trenchless Technology: San Diego’s First Aqueduct Treated Water Tunnels Rehabilitation Progressive Design Build Project Evaluation

The Project involved rehabilitating three 72-in. tunnels, with unique condition and accessibility challenges, under a compressed design and construction schedule of less than 1 year with three 10-day shutdowns to work in the tunnels. The project team, comprised of Michels Trenchless Inc. and Stantec, implemented innovative solutions to address these challenges. Geopolymer lining and fiberglass reinforced pipe (FRP) were selected to restore the tunnels’ integrity and extend their lifespan by 75+ years. The team installed approximately 3,600 ft of the geopolymer liner in the Lilac and Red Mountain Tunnels during two 10-day shutdowns. For the more deteriorated Oat Hill Tunnel, 63-in. FRP sliplining was used. The project team set a new record for the largest diameter and fastest installation of FRP sliplining, completing 3,600 linear feet around the clock in just 3 days. The project achieved timeline milestones, completing the rehabilitation within the three planned shutdowns of 10 days each.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.056
Citations
1
Primary Topic
Geotechnical Engineering and Underground Structures
Type
article
Field-Weighted Citation Impact
0.26
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Advancements in Trenchless Technology: San Diego’s First Aqueduct Treated Water Tunnels Rehabilitation Progressive Design Build Project Evaluation

Ali Alavi, Greg Raines, Nita Kazi
1 citations
Geotechnical Engineering and Underground Structures
0.26
article

Advancements in Trenchless Technology: San Diego’s First Aqueduct Treated Water Tunnels Rehabilitation Progressive Design Build Project Evaluation

Ali Alavi, Greg Raines, Nita Kazi
article en
1 citations

Abstract

The Project involved rehabilitating three 72-in. tunnels, with unique condition and accessibility challenges, under a compressed design and construction schedule of less than 1 year with three 10-day shutdowns to work in the tunnels. The project team, comprised of Michels Trenchless Inc. and Stantec, implemented innovative solutions to address these challenges. Geopolymer lining and fiberglass reinforced pipe (FRP) were selected to restore the tunnels’ integrity and extend their lifespan by 75+ years. The team installed approximately 3,600 ft of the geopolymer liner in the Lilac and Red Mountain Tunnels during two 10-day shutdowns. For the more deteriorated Oat Hill Tunnel, 63-in. FRP sliplining was used. The project team set a new record for the largest diameter and fastest installation of FRP sliplining, completing 3,600 linear feet around the clock in just 3 days. The project achieved timeline milestones, completing the rehabilitation within the three planned shutdowns of 10 days each.

Stantec (United States) (US), Stantec (Canada) (CA)
Clean water and sanitation
Openalex Percentile: Top 45%
Geotechnical Engineering and Underground Structures
0.26
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Advancements in Trenchless Technology: San Diego’s First Aqueduct Treated Water Tunnels Rehabilitation Progressive Design Build Project Evaluation — Ali Alavi, Greg Raines, et al. · (2024) | TGRS Research Map | TGRS