Extreme Sewer Makeover: Large-Diameter Interceptor Edition

The Big Dry Creek Interceptor (BDCI) serves approximately 90,000 residents with collection through five separate sanitary sewer districts in south suburban Denver. Through internal pipe investigations spanning nearly two decades, the Southgate Sanitation District (District), located in Centennial, Colorado, identified sanitary sewer manholes and main line segments on the BDCI requiring rehabilitation due to aging and deterioration. A multi-year, five phase rehabilitation program was initiated to rehabilitate all remaining unlined RCP segments in the District-controlled portion of the BDCI. The results of the evaluation, analysis, criticality, project grouping, and engineer’s opinions of probable construction costs (EOPCCs) were utilized to phase the BDCI Sanitary Sewer Rehabilitation Project (Project). Due to the criticality of the BDCI, several unique design and construction solutions were required to provide crucial rehabilitation of vintage infrastructure to serve communities and protect natural resources.

Authors

Institutions

Publication Details

Published
2024-08-30
DOI
https://doi.org/10.1061/9780784485576.029
Primary Topic
Water Systems and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Extreme Sewer Makeover: Large-Diameter Interceptor Edition

Mike Lehrburger, Brett J. Holzapfel, Matthew D. Gallagher
Water Systems and Optimization
article

Extreme Sewer Makeover: Large-Diameter Interceptor Edition

Mike Lehrburger, Brett J. Holzapfel, Matthew D. Gallagher
article en

Abstract

The Big Dry Creek Interceptor (BDCI) serves approximately 90,000 residents with collection through five separate sanitary sewer districts in south suburban Denver. Through internal pipe investigations spanning nearly two decades, the Southgate Sanitation District (District), located in Centennial, Colorado, identified sanitary sewer manholes and main line segments on the BDCI requiring rehabilitation due to aging and deterioration. A multi-year, five phase rehabilitation program was initiated to rehabilitate all remaining unlined RCP segments in the District-controlled portion of the BDCI. The results of the evaluation, analysis, criticality, project grouping, and engineer’s opinions of probable construction costs (EOPCCs) were utilized to phase the BDCI Sanitary Sewer Rehabilitation Project (Project). Due to the criticality of the BDCI, several unique design and construction solutions were required to provide crucial rehabilitation of vintage infrastructure to serve communities and protect natural resources.

James S. McDonnell Foundation (US), Ampio Pharmaceuticals (United States) (US), McKinsey & Company (United States) (US)
Openalex Percentile: Top 84%
Water Systems and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Extreme Sewer Makeover: Large-Diameter Interceptor Edition — Mike Lehrburger, Brett J. Holzapfel, et al. · (2024) | TGRS Research Map | TGRS