Integrated two-stage multi-factory assembly scheduling with maintenance considerations

In the dynamic landscape of contemporary industry, integrating maintenance practices with production scheduling is essential for sustaining operational efficiency and competitiveness. This study addresses a two-stage multi-factory assembly scheduling problem, introducing an innovative approach that incorporates maintenance practices to enhance system reliability in the face of unexpected machine failures. For deterministic scheduling, a tailored mixed-integer programming model is presented to minimise the makespan. This model is extended to formulate a stochastic schedule, accommodating unforeseen machine breakdowns through stochastic distributions. The extension includes the integration of preventive and corrective maintenance activities into an integrated two-stage multi-factory assembly scheduling problem. To solve the resulting optimisation problem, a decomposition algorithm utilising an exact solver is proposed. This approach breaks down the main model into smaller models, addressing computational challenges. Comparative analyses against the widely adopted CPLEX software across various instances validate the effectiveness of our approach. A significant finding from this comparison is that our decomposition algorithm outperforms the exact solver, achieving the optimal solution at a faster rate. In sensitivity analyses, the results underscore the superior solution-finding capability of our integrated stochastic model compared to maintenance heuristics from existing literature.

Authors

Institutions

Publication Details

Journal
International Journal of Production Research
Published
2024-08-29
DOI
https://doi.org/10.1080/00207543.2024.2396512
Citations
15
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
5.23
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated two-stage multi-factory assembly scheduling with maintenance considerations

Amir M. Fathollahi‐Fard, Michel Gendreau, Hamed Kazemi, Mustapha Nourelfath
15 citations
International Journal of Production Research
Scheduling and Optimization Algorithms
5.23
article

Integrated two-stage multi-factory assembly scheduling with maintenance considerations

Amir M. Fathollahi‐Fard, Michel Gendreau, Hamed Kazemi, Mustapha Nourelfath
article en
15 citations

Abstract

In the dynamic landscape of contemporary industry, integrating maintenance practices with production scheduling is essential for sustaining operational efficiency and competitiveness. This study addresses a two-stage multi-factory assembly scheduling problem, introducing an innovative approach that incorporates maintenance practices to enhance system reliability in the face of unexpected machine failures. For deterministic scheduling, a tailored mixed-integer programming model is presented to minimise the makespan. This model is extended to formulate a stochastic schedule, accommodating unforeseen machine breakdowns through stochastic distributions. The extension includes the integration of preventive and corrective maintenance activities into an integrated two-stage multi-factory assembly scheduling problem. To solve the resulting optimisation problem, a decomposition algorithm utilising an exact solver is proposed. This approach breaks down the main model into smaller models, addressing computational challenges. Comparative analyses against the widely adopted CPLEX software across various instances validate the effectiveness of our approach. A significant finding from this comparison is that our decomposition algorithm outperforms the exact solver, achieving the optimal solution at a faster rate. In sensitivity analyses, the results underscore the superior solution-finding capability of our integrated stochastic model compared to maintenance heuristics from existing literature.

International Journal of Production ResearchVol. 63(6)
Macau University of Science and Technology (MO), Université du Québec à Montréal (CA), Innovation Engineering (Italy) (IT), Université Laval (CA), Polytechnique Montréal (CA)
Openalex Percentile: Top 4%
Scheduling and Optimization Algorithms
5.23
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integrated two-stage multi-factory assembly scheduling with maintenance considerations — Amir M. Fathollahi‐Fard, Michel Gendreau, et al. · International Journal of Production Research (2024) | TGRS Research Map | TGRS