Optimizing Asset Management: Comprehensive Analysis and Innovative Strategy Design to Increase the Effectiveness of Life Cycle Delivery at PT Pembangkitan Jawa-Bali Services

Asset management is the art and science of making the right decisions and optimizing the delivery of value from organizational assets. ( Institute of Asset Management , 2010). PT PLN Pembangkitan Jawa Bali Services, which is often abbreviated as PT PJB Services, is a subsidiary of PT Pembangkitan Jawa-Bali (PT PJB) . This company operates in the field of power plant operation and maintenance services, as well as supporting services related to power plants. The company has a strong focus on asset management, given its role in managing and maintaining critical power generation assets. This research examines the implementation of multidimensional strategies in optimizing asset management at PT Pembangkitan Jawa-Bali Services (PJB Services). The main focus of the analysis is to test the variables that influence the success of asset performance at PT Pembangkitan Jawa Bali Services based on group 3 ( Life Cycle Delivery ) consist of 11 key dimensions of asset management: Technical Standards & Legislation , Asset Creation & Acquisition , Systems Engineering , Configuration Management , Maintenance Delivery. Reliability Engineering, Asset Operation, Resource Management, Shutdown & Outage Management, Fault & Incident Response, Asset Decommissioning & Disposal. The main aim of the research is to design an integrated approach to improve the effectiveness of corporate asset management. The method used in this research is the Structural Equation Model with the Partial Least Square approach. The research results revealed that the accepted hypothesis is H1, H2, H3, H4, H9, H10, H12, H16, H17, H18, and H19 are acceptable because they have t-statistic values > 1.96 and p-values < 0.05. Meanwhile, the hypotheses H5, H6, H7, H8, H11, H13, H14, and H15 were rejected because they had t-statistic values > 1.96 and p-values > 0.05.

Authors

Institutions

Publication Details

Journal
International Journal of Current Science Research and Review
Published
2024-08-25
DOI
https://doi.org/10.47191/ijcsrr/v7-i8-81
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Asset Management: Comprehensive Analysis and Innovative Strategy Design to Increase the Effectiveness of Life Cycle Delivery at PT Pembangkitan Jawa-Bali Services

Winda Nur Cahyo, Farid Agung Waskita
International Journal of Current Science Research and Review
Management and Optimization Techniques
article

Optimizing Asset Management: Comprehensive Analysis and Innovative Strategy Design to Increase the Effectiveness of Life Cycle Delivery at PT Pembangkitan Jawa-Bali Services

Winda Nur Cahyo, Farid Agung Waskita
article en

Abstract

Asset management is the art and science of making the right decisions and optimizing the delivery of value from organizational assets. ( Institute of Asset Management , 2010). PT PLN Pembangkitan Jawa Bali Services, which is often abbreviated as PT PJB Services, is a subsidiary of PT Pembangkitan Jawa-Bali (PT PJB) . This company operates in the field of power plant operation and maintenance services, as well as supporting services related to power plants. The company has a strong focus on asset management, given its role in managing and maintaining critical power generation assets. This research examines the implementation of multidimensional strategies in optimizing asset management at PT Pembangkitan Jawa-Bali Services (PJB Services). The main focus of the analysis is to test the variables that influence the success of asset performance at PT Pembangkitan Jawa Bali Services based on group 3 ( Life Cycle Delivery ) consist of 11 key dimensions of asset management: Technical Standards & Legislation , Asset Creation & Acquisition , Systems Engineering , Configuration Management , Maintenance Delivery. Reliability Engineering, Asset Operation, Resource Management, Shutdown & Outage Management, Fault & Incident Response, Asset Decommissioning & Disposal. The main aim of the research is to design an integrated approach to improve the effectiveness of corporate asset management. The method used in this research is the Structural Equation Model with the Partial Least Square approach. The research results revealed that the accepted hypothesis is H1, H2, H3, H4, H9, H10, H12, H16, H17, H18, and H19 are acceptable because they have t-statistic values > 1.96 and p-values < 0.05. Meanwhile, the hypotheses H5, H6, H7, H8, H11, H13, H14, and H15 were rejected because they had t-statistic values > 1.96 and p-values > 0.05.

International Journal of Current Science Research and ReviewVol. 07(08)
Islamic University of Indonesia (ID)
Responsible consumption and production
Openalex Percentile: Top 76%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.