MODEL PENJADWALAN BACKWARD HYBRID FLOW SHOP 2 STAGE UNTUK MEMINIMASI MEAN FLOWTIME

The scheduling problem is a common challenge when it comes to executing tasks, making the resolution of this issue crucial for decision-making in production activities. The problem addressed in this research is the company's desire to conduct production without waiting times between stages to maintain the quality of pharmaceutical raw materials. Additionally, the production results must meet predefined due dates. The production system formed is a Hybrid Flow Shop system, which is an extension of the Flow Shop concept where one or all stages have identical parallel machines. The objective of this study is to minimize the time between job start and job completion, defined in scheduling problems as the minimization of mean Flow time. The research collected data from 5 products in the company to model according to the research objectives. Process times for each stage and due dates for each product have been predetermined. After modeling and processing using the LINGO application, the optimal result obtained is backward scheduling with an average flow time of 12.6. This demonstrates that the model in this research effectively addresses the Hybrid Flow Shop problem using backward scheduling to minimize mean flow time

Authors

Institutions

Publication Details

Journal
Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan Statistika
Published
2024-08-08
DOI
https://doi.org/10.46306/lb.v5i2.706
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

MODEL PENJADWALAN BACKWARD HYBRID FLOW SHOP 2 STAGE UNTUK MEMINIMASI MEAN FLOWTIME

Didit Damur Rochman, Asep Anwar, Rendiyatna Ferdian
Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan Statistika
Management and Optimization Techniques
article

MODEL PENJADWALAN BACKWARD HYBRID FLOW SHOP 2 STAGE UNTUK MEMINIMASI MEAN FLOWTIME

Didit Damur Rochman, Asep Anwar, Rendiyatna Ferdian
article en

Abstract

The scheduling problem is a common challenge when it comes to executing tasks, making the resolution of this issue crucial for decision-making in production activities. The problem addressed in this research is the company's desire to conduct production without waiting times between stages to maintain the quality of pharmaceutical raw materials. Additionally, the production results must meet predefined due dates. The production system formed is a Hybrid Flow Shop system, which is an extension of the Flow Shop concept where one or all stages have identical parallel machines. The objective of this study is to minimize the time between job start and job completion, defined in scheduling problems as the minimization of mean Flow time. The research collected data from 5 products in the company to model according to the research objectives. Process times for each stage and due dates for each product have been predetermined. After modeling and processing using the LINGO application, the optimal result obtained is backward scheduling with an average flow time of 12.6. This demonstrates that the model in this research effectively addresses the Hybrid Flow Shop problem using backward scheduling to minimize mean flow time

Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan StatistikaVol. 5(2)
Universitas Widyatama (ID)
Openalex Percentile: Top 76%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

MODEL PENJADWALAN BACKWARD HYBRID FLOW SHOP 2 STAGE UNTUK MEMINIMASI MEAN FLOWTIME — Didit Damur Rochman, Asep Anwar, et al. · Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan Statistika (2024) | TGRS Research Map | TGRS