PENERAPAN CRITICAL PATH METHOD (CPM) DALAM MENGANALISIS MANAJEMEN WAKTU PADA PERENCANAAN IKLAN GMS DIGITAL MARKETING

Planning helps monitor activities. to achieve the expected efficiency and effectiveness. In advertising planning at GMS Digital Marketing, there are often losses. The purpose of this study is to find out how to manage good time in advertising planning in GMS Digital Marketing and find out what efforts can be made so that advertising planning has efficient time. A mathematical approach called Critical Path Analysis (CPM) is used to organize the grouping of project operations. The project activities described using the CPM Method are a two-round procedure consisting of a forward and backward approach to setting a schedule when conducting a critical path analysis. ES and EF are set up during the forwarding process. During the transfer, LS and LF are determined. Early Start (ES) is the fastest way to start an activity. CPM is a cost-cutting approach for projects. We can know when costs and schedules need to be negotiated to meet project deadlines while keeping costs as low as possible. When a dimension is used, then CPM is used. (More accurate time estimates). Therefore, from the results of this study, a critical path is obtained that requires additional labor and time in completing the work

Authors

Institutions

Publication Details

Journal
Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan Statistika
Published
2024-08-08
DOI
https://doi.org/10.46306/lb.v5i2.627
Primary Topic
Blockchain Technology in Education and Learning
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PENERAPAN CRITICAL PATH METHOD (CPM) DALAM MENGANALISIS MANAJEMEN WAKTU PADA PERENCANAAN IKLAN GMS DIGITAL MARKETING

Mayang Modelina Cynthia, Hendra Cipta, Riri Syafitri Lubis
Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan Statistika
Blockchain Technology in Education and Learning
article

PENERAPAN CRITICAL PATH METHOD (CPM) DALAM MENGANALISIS MANAJEMEN WAKTU PADA PERENCANAAN IKLAN GMS DIGITAL MARKETING

Mayang Modelina Cynthia, Hendra Cipta, Riri Syafitri Lubis
article en

Abstract

Planning helps monitor activities. to achieve the expected efficiency and effectiveness. In advertising planning at GMS Digital Marketing, there are often losses. The purpose of this study is to find out how to manage good time in advertising planning in GMS Digital Marketing and find out what efforts can be made so that advertising planning has efficient time. A mathematical approach called Critical Path Analysis (CPM) is used to organize the grouping of project operations. The project activities described using the CPM Method are a two-round procedure consisting of a forward and backward approach to setting a schedule when conducting a critical path analysis. ES and EF are set up during the forwarding process. During the transfer, LS and LF are determined. Early Start (ES) is the fastest way to start an activity. CPM is a cost-cutting approach for projects. We can know when costs and schedules need to be negotiated to meet project deadlines while keeping costs as low as possible. When a dimension is used, then CPM is used. (More accurate time estimates). Therefore, from the results of this study, a critical path is obtained that requires additional labor and time in completing the work

Jurnal Lebesgue Jurnal Ilmiah Pendidikan Matematika Matematika dan StatistikaVol. 5(2)
Universitas Islam Negeri Sumatera Utara (ID)
Decent work and economic growth
Openalex Percentile: Top 79%
Blockchain Technology in Education and Learning
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.