Maturing the design: challenges in maturing a first of a kind fusion power plant

The design, delivery and operation of a large-scale infrastructure project are challenging at best. For the Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP), the challenges increased dramatically. In addition to being a large-scale infrastructure project, it is a cutting edge, first of a kind (FOAK) technology demonstrator. The design teams are working in a volatile, uncertain, complex and ambiguous environment, where technology is constantly emerging, maturing and changing. STEP will be unlike any power plant ever built and requires the development of new technologies and capabilities, but also a novel approach to planning and maturing the design. By taking a holistic view of the engineering life cycle from the start, the programme will be better positioned to achieve an SPP that is fit for purpose and can be used to show a path to ultimate commercial viability for subsequent power plants. This paper will review the key challenges in maturing a FOAK fusion power plant and look in depth at how the STEP team are maturing the required capabilities and planning to ensure successful delivery of the SPP. This article is part of the theme issue 'Delivering Fusion Energy - The Spherical Tokamak for Energy Production (STEP)'.

Authors

Institutions

Publication Details

Journal
Philosophical Transactions of the Royal Society A Mathematical Physical and Engineering Sciences
Published
2024-08-26
DOI
https://doi.org/10.1098/rsta.2023.0412
Citations
6
Primary Topic
Space exploration and regulation
Type
article
Field-Weighted Citation Impact
1.99
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Maturing the design: challenges in maturing a first of a kind fusion power plant

Chris Waldon, Debbie Kempton
6 citations
Philosophical Transactions of the Royal Society A Mathematical Physical and Engineering Sciences
Space exploration and regulation
1.99
article

Maturing the design: challenges in maturing a first of a kind fusion power plant

Chris Waldon, Debbie Kempton
article en
6 citations

Abstract

The design, delivery and operation of a large-scale infrastructure project are challenging at best. For the Spherical Tokamak for Energy Production (STEP) prototype powerplant (SPP), the challenges increased dramatically. In addition to being a large-scale infrastructure project, it is a cutting edge, first of a kind (FOAK) technology demonstrator. The design teams are working in a volatile, uncertain, complex and ambiguous environment, where technology is constantly emerging, maturing and changing. STEP will be unlike any power plant ever built and requires the development of new technologies and capabilities, but also a novel approach to planning and maturing the design. By taking a holistic view of the engineering life cycle from the start, the programme will be better positioned to achieve an SPP that is fit for purpose and can be used to show a path to ultimate commercial viability for subsequent power plants. This paper will review the key challenges in maturing a FOAK fusion power plant and look in depth at how the STEP team are maturing the required capabilities and planning to ensure successful delivery of the SPP. This article is part of the theme issue 'Delivering Fusion Energy - The Spherical Tokamak for Energy Production (STEP)'.

Philosophical Transactions of the Royal Society A Mathematical Physical and Engineering SciencesVol. 382(2280)
United Kingdom Atomic Energy Authority (GB)
Industry, innovation and infrastructure
Openalex Percentile: Top 14%
Space exploration and regulation
1.99
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Maturing the design: challenges in maturing a first of a kind fusion power plant — Chris Waldon, Debbie Kempton · Philosophical Transactions of the Royal Society A Mathematical Physical and Engineering Sciences (2024) | TGRS Research Map | TGRS