R&D of a timing measurement ASIC for possible HL-LHC upgrade

The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN will undergo a major upgrade for the High Luminosity phase of the LHC (HL-LHC), which is expected to start in 2029 [1] . In addition to improving the detector rate capabilities and performance at increased higher luminosity, precision timing measurements are added to mitigate pile-up effects. The timing detector currently under construction covers pseudo-rapidity up to η = 3 [2] . A possible pathway for further improvements is the extension of timing capabilities to cover the full tracker acceptance up to η = 4 . Low Gain Avalanche Detectors (LGAD) pixels have been shown to be a suitable candidate for replacing a part of the pixel detector end-caps during a future Long Shutdown or Year-End Technical Stop of the LHC. Here, we present preliminary results of our design efforts towards a readout Application-specific integrated circuit (ASIC) capable of operating with LGAD pixel sensors [3] . The first results of the modeling of a part of the ASIC are demonstrated.

Authors

Institutions

Publication Details

Journal
Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment
Published
2024-08-26
DOI
https://doi.org/10.1016/j.nima.2024.169802
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

R&D of a timing measurement ASIC for possible HL-LHC upgrade

A. Ghimouz
Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment
Particle Detector Development and Performance
article

R&D of a timing measurement ASIC for possible HL-LHC upgrade

A. Ghimouz
article en

Abstract

The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN will undergo a major upgrade for the High Luminosity phase of the LHC (HL-LHC), which is expected to start in 2029 [1] . In addition to improving the detector rate capabilities and performance at increased higher luminosity, precision timing measurements are added to mitigate pile-up effects. The timing detector currently under construction covers pseudo-rapidity up to η = 3 [2] . A possible pathway for further improvements is the extension of timing capabilities to cover the full tracker acceptance up to η = 4 . Low Gain Avalanche Detectors (LGAD) pixels have been shown to be a suitable candidate for replacing a part of the pixel detector end-caps during a future Long Shutdown or Year-End Technical Stop of the LHC. Here, we present preliminary results of our design efforts towards a readout Application-specific integrated circuit (ASIC) capable of operating with LGAD pixel sensors [3] . The first results of the modeling of a part of the ASIC are demonstrated.

Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated EquipmentVol. 1069
Paul Scherrer Institute (CH)
Affordable and clean energy
Openalex Percentile: Top 96%
Particle Detector Development and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

R&D of a timing measurement ASIC for possible HL-LHC upgrade — A. Ghimouz · Nuclear Instruments and Methods in Physics Research Section A Accelerators Spectrometers Detectors and Associated Equipment (2024) | TGRS Research Map | TGRS