Application of BIM Technology in Techo International Airport Project

In airport-type large-scale engineering projects, BIM technology can play its own advantages to maximize the relief of large-scale airport construction, long cycle, multiple specialties and quality requirements and other challenges. Taking Phnom Penh Tak Chong Airport project as an example, this project maximizes the information value of BIM by applying BIM technology to deepen the design of contract drawings in the early stage and applying BIM technology to construction management in the construction stage, and at the same time, applying Dynamo, 3D scanning, P6 and independently researched and developed construction interactive platform and other methods. At the same time, for the airport project construction difficulties and key content, based on software simulation analysis to ensure the structural stability of the construction process. It has been proved that the application of BIM technology can reduce the drawing changes, effectively shorten the construction period, reduce the construction difficulty and save the cost to ensure the smooth construction of the project.

Authors

Publication Details

Journal
Academic Journal of Science and Technology
Published
2024-08-20
DOI
https://doi.org/10.54097/af3zag34
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of BIM Technology in Techo International Airport Project

Xiangyang Jiang, Wen Wen, Ran Wang, Zhijie Zhu et al.
Academic Journal of Science and Technology
BIM and Construction Integration
article

Application of BIM Technology in Techo International Airport Project

Xiangyang Jiang, Wen Wen, Ran Wang, Zhijie Zhu, Hanghang Fu
article en

Abstract

In airport-type large-scale engineering projects, BIM technology can play its own advantages to maximize the relief of large-scale airport construction, long cycle, multiple specialties and quality requirements and other challenges. Taking Phnom Penh Tak Chong Airport project as an example, this project maximizes the information value of BIM by applying BIM technology to deepen the design of contract drawings in the early stage and applying BIM technology to construction management in the construction stage, and at the same time, applying Dynamo, 3D scanning, P6 and independently researched and developed construction interactive platform and other methods. At the same time, for the airport project construction difficulties and key content, based on software simulation analysis to ensure the structural stability of the construction process. It has been proved that the application of BIM technology can reduce the drawing changes, effectively shorten the construction period, reduce the construction difficulty and save the cost to ensure the smooth construction of the project.

Academic Journal of Science and TechnologyVol. 12(1)
Industry, innovation and infrastructure
Openalex Percentile: Top 86%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Application of BIM Technology in Techo International Airport Project — Xiangyang Jiang, Wen Wen, et al. · Academic Journal of Science and Technology (2024) | TGRS Research Map | TGRS