Freight train scheduling for industrial lines with multiple railway undertakings

With the liberalisation of the rail freight market, the number of railway undertakings in operation is increasing. Trains run by several railway undertakings (RUs) converge at industrial lines leading up to terminals. Here, uncoordinated interaction between mainline RUs and limited infrastructure capacity leads to bottlenecks, which reduces resource utilisation of railway undertakings. Outsourcing last-mile operations to an independent local railway undertaking can improve capacity utilisation and decrease the time engines of mainline engines spend within the considered network. In this paper, we propose the Industrial Line Scheduling Problem with multiple RU, a resource scheduling model for freight trains at industrial lines. The aim is to minimise unproductive time of mainline engines and the number of deployed local engines. The results show that the potential savings per employed local engine are highly dependent the timetables of inbound and outbound trains within the network, the dwell time of railcars and on the degree of local railway undertaking involvement.

Authors

Institutions

Publication Details

Journal
Journal of Rail Transport Planning & Management
Published
2024-08-23
DOI
https://doi.org/10.1016/j.jrtpm.2024.100466
Citations
5
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
1.74
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Freight train scheduling for industrial lines with multiple railway undertakings

Daniel Haalboom, Nikola Bešinović
5 citations
Journal of Rail Transport Planning & Management
Railway Systems and Energy Efficiency
1.74
article

Freight train scheduling for industrial lines with multiple railway undertakings

Daniel Haalboom, Nikola Bešinović
article en
5 citations

Abstract

With the liberalisation of the rail freight market, the number of railway undertakings in operation is increasing. Trains run by several railway undertakings (RUs) converge at industrial lines leading up to terminals. Here, uncoordinated interaction between mainline RUs and limited infrastructure capacity leads to bottlenecks, which reduces resource utilisation of railway undertakings. Outsourcing last-mile operations to an independent local railway undertaking can improve capacity utilisation and decrease the time engines of mainline engines spend within the considered network. In this paper, we propose the Industrial Line Scheduling Problem with multiple RU, a resource scheduling model for freight trains at industrial lines. The aim is to minimise unproductive time of mainline engines and the number of deployed local engines. The results show that the potential savings per employed local engine are highly dependent the timetables of inbound and outbound trains within the network, the dwell time of railcars and on the degree of local railway undertaking involvement.

Journal of Rail Transport Planning & ManagementVol. 31
Technische Universität Dresden (DE)
Openalex Percentile: Top 14%
Railway Systems and Energy Efficiency
1.74
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Freight train scheduling for industrial lines with multiple railway undertakings — Daniel Haalboom, Nikola Bešinović · Journal of Rail Transport Planning & Management (2024) | TGRS Research Map | TGRS