Optimalisasi Penyebab Keterlambatan Proyek Revitalisasi Gedung Sekolah Pascasarjana Kampus B Universitas Airlangga

Delays in the Airlangga University Postgraduate school building revitalization project occurred due to design changes, weather and some invalid data. The aim objective this study is to identify the contributing components. delays and obtain the root of the problem which has the most important role in resolving work delays on a construction project for the revitalization of the postgraduate building at Arilangga University. This research began with collecting data through field surveys, and observing what factors caused delays that occurred during the execution of the building of the Arilangga University postgraduate building revitalization project. The methods for gathering data that were employed in this study are, firstly primary data and secondly secondary data. Primary data is data produced through field surveys, interviews and observations. Meanwhile, secondary data is based on literature study, information from related parties. This research uses the same data collection techniques as in research conducted by others relevant research. Interview and observational data revealed that the elements contributing to the delays in the construction of the Arilangga University postgraduate building revitalization project were: 1) design changes due to the unsuitability of the function of several building structures, 2) delays in material supplies, 3) unpredictable weather. Of the several factors causing delays Regarding this project, one could say that delays occurred in design changes and delays in material supplies

Authors

Institutions

Publication Details

Journal
Jurnal Basement.
Published
2024-08-23
DOI
https://doi.org/10.36873/basement.v2i2.14873
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimalisasi Penyebab Keterlambatan Proyek Revitalisasi Gedung Sekolah Pascasarjana Kampus B Universitas Airlangga

Agus Wahyudi, Cilda Thesisa Ilmawan Dzinnur, Yayu Sriwahyuni Hamzah
Jurnal Basement.
Geotechnical and construction materials studies
article

Optimalisasi Penyebab Keterlambatan Proyek Revitalisasi Gedung Sekolah Pascasarjana Kampus B Universitas Airlangga

Agus Wahyudi, Cilda Thesisa Ilmawan Dzinnur, Yayu Sriwahyuni Hamzah
article en

Abstract

Delays in the Airlangga University Postgraduate school building revitalization project occurred due to design changes, weather and some invalid data. The aim objective this study is to identify the contributing components. delays and obtain the root of the problem which has the most important role in resolving work delays on a construction project for the revitalization of the postgraduate building at Arilangga University. This research began with collecting data through field surveys, and observing what factors caused delays that occurred during the execution of the building of the Arilangga University postgraduate building revitalization project. The methods for gathering data that were employed in this study are, firstly primary data and secondly secondary data. Primary data is data produced through field surveys, interviews and observations. Meanwhile, secondary data is based on literature study, information from related parties. This research uses the same data collection techniques as in research conducted by others relevant research. Interview and observational data revealed that the elements contributing to the delays in the construction of the Arilangga University postgraduate building revitalization project were: 1) design changes due to the unsuitability of the function of several building structures, 2) delays in material supplies, 3) unpredictable weather. Of the several factors causing delays Regarding this project, one could say that delays occurred in design changes and delays in material supplies

Jurnal Basement.Vol. 2(2)
Universitas Sunan Giri (ID)
Sustainable cities and communities
Openalex Percentile: Top 85%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimalisasi Penyebab Keterlambatan Proyek Revitalisasi Gedung Sekolah Pascasarjana Kampus B Universitas Airlangga — Agus Wahyudi, Cilda Thesisa Ilmawan Dzinnur, et al. · Jurnal Basement. (2024) | TGRS Research Map | TGRS