Strategies for improving project risk management via communication and integration: the case of Jordan

Purpose Project information is widely and thoroughly exchanged within construction projects. However, the risk management process exhibits deficiencies in coordination and visibility, particularly in developing countries. Practitioners in developing countries often engage in Project Risk Management (PRiM) using practices that inadvertently hinder project success, frequently resulting in suboptimal outcomes. Therefore, this research explores practices within Project Integration Management (PIM) and Project Communication Management (PCmM) that could enhance PRiM and improve managerial proficiency to achieve project success in developing countries. Design/methodology/approach The PIM, PCmM and PRiM processes were explored from the literature; the data was gathered initially by close-ended interviews conducted with a panel of twelve experts followed by a well-structured questionnaire. Structural Equation Modeling (SEM) was employed via AMOS to analyze the data and construct a model representing the intricate relationships between the processes. Additionally, the validity and reliability of the method were inspected. Findings The data analysis confirmed that PIM and PCmM were correlated according to contractors and consultants in the Jordanian construction industry. Furthermore, both have a positive influence on the PRiM. In addition, a 13-step process was developed to apply extra processes and practices to ensure better implementation of the PRiM in developing countries. Originality/value The literature highlights that integration and communication management influence project performance. However, there is a lack of research utilizing practices from these knowledge areas to achieve better project risk management implementation. This research highlights two of the most underrated knowledge areas in project management. Therefore, a framework was devised, comprising processes that practitioners should take into account during the planning phase leading to efficient PRiM to enhance their managerial proficiency.

Authors

Institutions

Publication Details

Journal
Engineering Construction & Architectural Management
Published
2024-08-23
DOI
https://doi.org/10.1108/ecam-05-2024-0536
Citations
2
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.98
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Strategies for improving project risk management via communication and integration: the case of Jordan

Abdullah Alghossoon, Olugbenro Ogunrinde, Mohammad Alhusban, Muhammad T. Hatamleh et al.
2 citations
Engineering Construction & Architectural Management
Construction Project Management and Performance
0.98
article

Strategies for improving project risk management via communication and integration: the case of Jordan

Abdullah Alghossoon, Olugbenro Ogunrinde, Mohammad Alhusban, Muhammad T. Hatamleh, Ammar Alzarrad
article en
2 citations

Abstract

Purpose Project information is widely and thoroughly exchanged within construction projects. However, the risk management process exhibits deficiencies in coordination and visibility, particularly in developing countries. Practitioners in developing countries often engage in Project Risk Management (PRiM) using practices that inadvertently hinder project success, frequently resulting in suboptimal outcomes. Therefore, this research explores practices within Project Integration Management (PIM) and Project Communication Management (PCmM) that could enhance PRiM and improve managerial proficiency to achieve project success in developing countries. Design/methodology/approach The PIM, PCmM and PRiM processes were explored from the literature; the data was gathered initially by close-ended interviews conducted with a panel of twelve experts followed by a well-structured questionnaire. Structural Equation Modeling (SEM) was employed via AMOS to analyze the data and construct a model representing the intricate relationships between the processes. Additionally, the validity and reliability of the method were inspected. Findings The data analysis confirmed that PIM and PCmM were correlated according to contractors and consultants in the Jordanian construction industry. Furthermore, both have a positive influence on the PRiM. In addition, a 13-step process was developed to apply extra processes and practices to ensure better implementation of the PRiM in developing countries. Originality/value The literature highlights that integration and communication management influence project performance. However, there is a lack of research utilizing practices from these knowledge areas to achieve better project risk management implementation. This research highlights two of the most underrated knowledge areas in project management. Therefore, a framework was devised, comprising processes that practitioners should take into account during the planning phase leading to efficient PRiM to enhance their managerial proficiency.

Engineering Construction & Architectural ManagementVol. 32(10)
University of Jordan (JO), Hashemite University (JO), Tarleton State University (US), Marshall University (US), Middle East University (JO)
Partnerships for the goals
Openalex Percentile: Top 22%
Construction Project Management and Performance
0.98
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.