Effects of Dry Periods on Nitrogen and Phosphorus Removal in Runoff Infiltration Devices and Their Biological Succession Patterns

When using runoff infiltration devices to remove nitrogen and phosphorus pollutants from urban runoff, the quality of the effluent is affected by the length of dry spells between rain events. This study presents a novel analysis of how these dry periods impact the device’s effectiveness in removing pollutants and the resulting biological succession within the filter. Our analysis examines nitrogen and phosphorus removal in a rainwater filtration context, providing new insights into how dry period duration influences infiltration system performance. The results indicate that biological processes have a significant impact on reducing total nitrogen (TN) and total phosphorus (TP) contents under different drying periods. A 3-day drying period is most effective for reducing TN through biological processes, while a 7-day period is best for TP reduction. This suggests that moderately extending the drying period improves TP removal efficiency but does not enhance TN removal. The dominant bacterial phylum responsible for denitrification and phosphorus removal is Proteobacteria, with Pseudomonas and Acinetobacter as the leading genera. As the drying period lengthens, the dominant genera shift from Pseudomonas to Massilia. At a 3-day drying period, denitrification primarily occurs through Pseudomonas on the surfaces of maifanite and zeolite. At a 7-day dry-out period, Acinetobacter is mainly responsible for phosphate removal on maifanite surfaces. However, after a 14-day dry-out period, both biomass and bioactivity of Pseudomonas and Acinetobacter decrease, leading to reduced efficiency in removing nitrogen and phosphorus pollutants from runoff infiltration devices. These results aid in developing runoff infiltration devices for specific scenarios and offer crucial guidance for regulating runoff pollution control technologies.

Authors

Institutions

Publication Details

Journal
Water
Published
2024-08-23
DOI
https://doi.org/10.3390/w16172372
Citations
2
Primary Topic
Constructed Wetlands for Wastewater Treatment
Type
article
Field-Weighted Citation Impact
0.59

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Effects of Dry Periods on Nitrogen and Phosphorus Removal in Runoff Infiltration Devices and Their Biological Succession Patterns

Yongwei Gong, Tian He, Xiaoli Du, Junqi Li et al.
2 citations
Water
Constructed Wetlands for Wastewater Treatment
0.59
article

Effects of Dry Periods on Nitrogen and Phosphorus Removal in Runoff Infiltration Devices and Their Biological Succession Patterns

Yongwei Gong, Tian He, Xiaoli Du, Junqi Li, Wenhai Wang, Chonghua Xue, Yimeng Zhao, Manman Liang, Yaxin Ren
article en
2 citations

Abstract

When using runoff infiltration devices to remove nitrogen and phosphorus pollutants from urban runoff, the quality of the effluent is affected by the length of dry spells between rain events. This study presents a novel analysis of how these dry periods impact the device’s effectiveness in removing pollutants and the resulting biological succession within the filter. Our analysis examines nitrogen and phosphorus removal in a rainwater filtration context, providing new insights into how dry period duration influences infiltration system performance. The results indicate that biological processes have a significant impact on reducing total nitrogen (TN) and total phosphorus (TP) contents under different drying periods. A 3-day drying period is most effective for reducing TN through biological processes, while a 7-day period is best for TP reduction. This suggests that moderately extending the drying period improves TP removal efficiency but does not enhance TN removal. The dominant bacterial phylum responsible for denitrification and phosphorus removal is Proteobacteria, with Pseudomonas and Acinetobacter as the leading genera. As the drying period lengthens, the dominant genera shift from Pseudomonas to Massilia. At a 3-day drying period, denitrification primarily occurs through Pseudomonas on the surfaces of maifanite and zeolite. At a 7-day dry-out period, Acinetobacter is mainly responsible for phosphate removal on maifanite surfaces. However, after a 14-day dry-out period, both biomass and bioactivity of Pseudomonas and Acinetobacter decrease, leading to reduced efficiency in removing nitrogen and phosphorus pollutants from runoff infiltration devices. These results aid in developing runoff infiltration devices for specific scenarios and offer crucial guidance for regulating runoff pollution control technologies.

WaterVol. 16(17)
Energy Foundation (CN), Beijing University of Civil Engineering and Architecture (CN)
National Natural Science Foundation of China
Clean water and sanitation
Openalex Percentile: Top 31%
Constructed Wetlands for Wastewater Treatment
0.59
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.