Construction Safety in Girder Installation Work on Cibitung – Cilincing Toll Road Construction Project

Toll road development, in its implementation, has a relatively high risk of work accidents, and it cannot be denied that work safety management is still weak and there is a lack of awareness about the magnitude of the risks that threaten workers. Girder erection work is included in high-risk work. The method used is HIRADC, according to PUPR Ministerial regulation No. 10 of 2021 concerning SMKK guidelines. This study aims to identify hazards, make risk level assessments, and make risk control efforts that can reduce the risk level of work accidents in girder installation work at the Cibitung – Cilincing Toll Road Construction Project. The limitation of the problem is that the research location only focuses on Section 4 of Sta 33+150, the Cibitung – Cilincing Toll Road Construction Project on the P2 – P3 JU Cakung Drain Pillar Span with the girder installation process using a Gantry Launcher. This study uses a qualitative research approach with a descriptive form to determine the possibility and the consequences that will occur, as well as control the hazard to reduce the possibility and severity. In this study, there are 2 data collection techniques: Primary Data (Observation, Interviews were conducted with 3 sources, K3 Experts, and a Questionnaire was conducted related to risk assessment of the likelihood and severity values) and Secondary Data. This research's novelty lies in using tools during the girder lifting process because the girder length is 50.8 m, and the danger factors are different. The questionnaire data collected found that implementation of the girder installation work identified 52 hazards, with a large level of risk are 20 hazards (38.46%) and medium risk levels are 32 hazards (61.54%). Control efforts by means of engineering, administration and personal protective equipment (PPE) found a decrease in the level of high risk and the level of moderate risk is no longer found, and the level of small risk becomes as many as 52 hazards (100%). So, it can be concluded that the results of the risk level assessment have been better than before.

Authors

Institutions

Publication Details

Journal
Proceeding of The International Conference on Multidisciplinary Research for Sustainable Innovation.
Published
2024-08-12
DOI
https://doi.org/10.31098/icmrsi.v1i.796
Citations
2
Primary Topic
Infrastructure Maintenance and Monitoring
Type
article
Field-Weighted Citation Impact
0.52
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Safety in Girder Installation Work on Cibitung – Cilincing Toll Road Construction Project

Halimah Tunafiah, Reynaldo Pratama, Arman Jayady, Carissa Komalasari et al.
2 citations
Proceeding of The International Conference on Multidisciplinary Research for Sustainable Innovation.
Infrastructure Maintenance and Monitoring
0.52
article

Construction Safety in Girder Installation Work on Cibitung – Cilincing Toll Road Construction Project

Halimah Tunafiah, Reynaldo Pratama, Arman Jayady, Carissa Komalasari, Ricky Kusmawan Natadipura, Rahman Danil, Tri Ismawanto
article en
2 citations

Abstract

Toll road development, in its implementation, has a relatively high risk of work accidents, and it cannot be denied that work safety management is still weak and there is a lack of awareness about the magnitude of the risks that threaten workers. Girder erection work is included in high-risk work. The method used is HIRADC, according to PUPR Ministerial regulation No. 10 of 2021 concerning SMKK guidelines. This study aims to identify hazards, make risk level assessments, and make risk control efforts that can reduce the risk level of work accidents in girder installation work at the Cibitung – Cilincing Toll Road Construction Project. The limitation of the problem is that the research location only focuses on Section 4 of Sta 33+150, the Cibitung – Cilincing Toll Road Construction Project on the P2 – P3 JU Cakung Drain Pillar Span with the girder installation process using a Gantry Launcher. This study uses a qualitative research approach with a descriptive form to determine the possibility and the consequences that will occur, as well as control the hazard to reduce the possibility and severity. In this study, there are 2 data collection techniques: Primary Data (Observation, Interviews were conducted with 3 sources, K3 Experts, and a Questionnaire was conducted related to risk assessment of the likelihood and severity values) and Secondary Data. This research's novelty lies in using tools during the girder lifting process because the girder length is 50.8 m, and the danger factors are different. The questionnaire data collected found that implementation of the girder installation work identified 52 hazards, with a large level of risk are 20 hazards (38.46%) and medium risk levels are 32 hazards (61.54%). Control efforts by means of engineering, administration and personal protective equipment (PPE) found a decrease in the level of high risk and the level of moderate risk is no longer found, and the level of small risk becomes as many as 52 hazards (100%). So, it can be concluded that the results of the risk level assessment have been better than before.

Proceeding of The International Conference on Multidisciplinary Research for Sustainable Innovation.Vol. 1
Universitas Persada Indonesia Yayasan Administrasi Indonesia (ID)
Sustainable cities and communities
Openalex Percentile: Top 37%
Infrastructure Maintenance and Monitoring
0.52
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.