A Main Production Planning Algorithm Based on Limited Resource Capacity Pools

A method of expressing resources as two dimensions of time and capability while tasks occupy resources proportionally is proposed to support the formulation of the main production plan under extensive management mode, focusing on the planning requirements of production capacity rather than fine operations in the master production planning. This article constructs a problem model for limited resource capacity pool constraints and production scheduling objectives, designs a gradient guided mutation NSGA-II algorithm, proposes a population initialization strategy that combines chromosome encoding, decoding, random and strategy, adopts adaptive genetic operators, and uses gradient descent method to guide mutation according to production capacity occupancy requirements, achieving the minimum planned period control of resource capacity. Finally, an example was used to verify that the system technology has good adaptability.

Authors

Institutions

Publication Details

Published
2024-08-04
DOI
https://doi.org/10.1109/icma61710.2024.10633018
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Main Production Planning Algorithm Based on Limited Resource Capacity Pools

H. J. Yang, Aimin Wang
Advanced Manufacturing and Logistics Optimization
article

A Main Production Planning Algorithm Based on Limited Resource Capacity Pools

H. J. Yang, Aimin Wang
article en

Abstract

A method of expressing resources as two dimensions of time and capability while tasks occupy resources proportionally is proposed to support the formulation of the main production plan under extensive management mode, focusing on the planning requirements of production capacity rather than fine operations in the master production planning. This article constructs a problem model for limited resource capacity pool constraints and production scheduling objectives, designs a gradient guided mutation NSGA-II algorithm, proposes a population initialization strategy that combines chromosome encoding, decoding, random and strategy, adopts adaptive genetic operators, and uses gradient descent method to guide mutation according to production capacity occupancy requirements, achieving the minimum planned period control of resource capacity. Finally, an example was used to verify that the system technology has good adaptability.

Beijing Institute of Technology (CN), Beijing Information Science & Technology University (CN)
Openalex Percentile: Top 82%
Advanced Manufacturing and Logistics Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A Main Production Planning Algorithm Based on Limited Resource Capacity Pools — H. J. Yang, Aimin Wang · (2024) | TGRS Research Map | TGRS