New Developments for the Trigger-Time-Event System for the W7-X Experiment

Since the first plasma operation in 2015, the superconducting fusion experiment Wendelstein 7-X has successfully completed four experiment campaigns (OP1.1, OP1.2a, OP1.2b, and OP2.1). The machine maintenance phase was completed at the end of January 2024, followed by the commissioning of W7-X. The start of the scientific plasma operation phase OP2.2 is planned for September 2024. The trigger-time-event (TTE) system is used by the central control systems, the technical components, and the diagnostics of W7-X for their time synchronization, for processing events, and for generating and receiving trigger signals. These use cases make it necessary to adapt the TTE system to the changing requirements of users. After an introduction to the functions and structure of the TTE system, this contribution describes the current expansion status of the TTE system and the planned modifications and expansion of the hardware and software of the TTE system. Finally, the current status of the planned work on the TTE system for the upcoming W7-X operational phase OP2.2 is presented. The contribution ends with a summary.

Authors

Institutions

Publication Details

Journal
IEEE Transactions on Nuclear Science
Published
2024-08-19
DOI
https://doi.org/10.1109/tns.2024.3445502
Citations
2
Primary Topic
Particle Detector Development and Performance
Type
article
Field-Weighted Citation Impact
1.32
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

New Developments for the Trigger-Time-Event System for the W7-X Experiment

J. Recknagel, Tobias Brockmann, M. Marquardt, J. Schacht et al.
2 citations
IEEE Transactions on Nuclear Science
Particle Detector Development and Performance
1.32
article

New Developments for the Trigger-Time-Event System for the W7-X Experiment

J. Recknagel, Tobias Brockmann, M. Marquardt, J. Schacht, T. Schröder
article en
2 citations

Abstract

Since the first plasma operation in 2015, the superconducting fusion experiment Wendelstein 7-X has successfully completed four experiment campaigns (OP1.1, OP1.2a, OP1.2b, and OP2.1). The machine maintenance phase was completed at the end of January 2024, followed by the commissioning of W7-X. The start of the scientific plasma operation phase OP2.2 is planned for September 2024. The trigger-time-event (TTE) system is used by the central control systems, the technical components, and the diagnostics of W7-X for their time synchronization, for processing events, and for generating and receiving trigger signals. These use cases make it necessary to adapt the TTE system to the changing requirements of users. After an introduction to the functions and structure of the TTE system, this contribution describes the current expansion status of the TTE system and the planned modifications and expansion of the hardware and software of the TTE system. Finally, the current status of the planned work on the TTE system for the upcoming W7-X operational phase OP2.2 is presented. The contribution ends with a summary.

IEEE Transactions on Nuclear ScienceVol. 72(3)
Max Planck Institute for Plasma Physics - Greifswald (DE), University of Rostock (DE)
Openalex Percentile: Top 11%
Particle Detector Development and Performance
1.32
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.