Utilizing the High Maturity Level of Digital Twin for Construction Resource

This article presents an approach to utilize the high maturity level of digital twin for construction resource monitoring. The digital twin is used in construction projects as a systematic representation of physical objects into virtual models of construction. While the resource monitoring system is used as a decision-making tool to optimize resource leveling optimization. A high maturity level is needed to provide an interoperable ecosystem for the construction monitoring process. The state-of-the-art literature review and gap identification are used through various studies related to the research objectives. The result shows that the integration of Building Information Modeling (BIM), geographic information system (GIS), machine learning (ML), and monitoring dashboard is needed for the digital twin resource monitoring model for controlling resource utilization on the project. A platform ecosystem is also required to effectively obtain an efficient decision making process for project construction. The study contributes to the framework of digital twin for aerial construction.

Authors

Institutions

Publication Details

Journal
Jurnal Teknobisnis
Published
2024-08-16
DOI
https://doi.org/10.12962/j24609463.v10i01.2071
Primary Topic
Digital Transformation in Industry
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Utilizing the High Maturity Level of Digital Twin for Construction Resource

Muhammad Rilly Aka Yogi, Gunawan Saroji
Jurnal Teknobisnis
Digital Transformation in Industry
article

Utilizing the High Maturity Level of Digital Twin for Construction Resource

Muhammad Rilly Aka Yogi, Gunawan Saroji
article en

Abstract

This article presents an approach to utilize the high maturity level of digital twin for construction resource monitoring. The digital twin is used in construction projects as a systematic representation of physical objects into virtual models of construction. While the resource monitoring system is used as a decision-making tool to optimize resource leveling optimization. A high maturity level is needed to provide an interoperable ecosystem for the construction monitoring process. The state-of-the-art literature review and gap identification are used through various studies related to the research objectives. The result shows that the integration of Building Information Modeling (BIM), geographic information system (GIS), machine learning (ML), and monitoring dashboard is needed for the digital twin resource monitoring model for controlling resource utilization on the project. A platform ecosystem is also required to effectively obtain an efficient decision making process for project construction. The study contributes to the framework of digital twin for aerial construction.

Jurnal TeknobisnisVol. 10(01)
University of Indonesia (ID)
Openalex Percentile: Top 82%
Digital Transformation in Industry
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.