Optimization of Staffing Levels and Personnel Budgeting Through Standardized Job Descriptions and Workload Analysis: A Case Study of Operations Director 1's Projects at PT Wijaya Karya (Persero) TBK

This research addresses the critical business issue of optimizing staffing levels and streamlining personnel budgeting within WIKA through the standardization of job descriptions and the determination of optimal personnel numbers. The study, driven by three key research questions, involved analyzing data from 26 medium-scale projects using Lean Office tools and Workload Analysis formats. Standardizing job descriptions led to a significant reduction in redundancies, with the Commercial section decreasing from 81 to 74 roles, Engineering from 37 to 21, and Finance & HC from 34 to 24. Optimal staffing levels were established by validating average working times with expert judgment, resulting in a more efficient allocation of human resources. This optimization saw the Finance & HR team reduce from 6 to 5 employees, Engineering from 9 to 8, and Commercial from 6 to 5, increasing individual work times and ensuring alignment with operational needs. Proper budget standards for personnel costs were developed by comparing historical and current data, leading to significant cost savings: Rp 243.69 million in Finance & HC, Rp 213.91 million in Engineering, and Rp 127.02 million in Commercial. These findings demonstrate that WIKA can enhance its operational performance and efficiency by implementing standardized job descriptions, optimal staffing levels, and accurate budget standards. Recommendations include adopting these standards across all medium project classifications and maintaining regular reviews to ensure continuous improvement, ultimately supporting sustainable growth in the construction industry.

Authors

Institutions

Publication Details

Journal
International Journal of Current Science Research and Review
Published
2024-08-15
DOI
https://doi.org/10.47191/ijcsrr/v7-i8-60
Citations
1
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.55
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimization of Staffing Levels and Personnel Budgeting Through Standardized Job Descriptions and Workload Analysis: A Case Study of Operations Director 1's Projects at PT Wijaya Karya (Persero) TBK

Nur Budi Mulyono, Adibowo Wicaksono Wahyu Utomo
1 citations
International Journal of Current Science Research and Review
Management and Optimization Techniques
0.55
article

Optimization of Staffing Levels and Personnel Budgeting Through Standardized Job Descriptions and Workload Analysis: A Case Study of Operations Director 1's Projects at PT Wijaya Karya (Persero) TBK

Nur Budi Mulyono, Adibowo Wicaksono Wahyu Utomo
article en
1 citations

Abstract

This research addresses the critical business issue of optimizing staffing levels and streamlining personnel budgeting within WIKA through the standardization of job descriptions and the determination of optimal personnel numbers. The study, driven by three key research questions, involved analyzing data from 26 medium-scale projects using Lean Office tools and Workload Analysis formats. Standardizing job descriptions led to a significant reduction in redundancies, with the Commercial section decreasing from 81 to 74 roles, Engineering from 37 to 21, and Finance & HC from 34 to 24. Optimal staffing levels were established by validating average working times with expert judgment, resulting in a more efficient allocation of human resources. This optimization saw the Finance & HR team reduce from 6 to 5 employees, Engineering from 9 to 8, and Commercial from 6 to 5, increasing individual work times and ensuring alignment with operational needs. Proper budget standards for personnel costs were developed by comparing historical and current data, leading to significant cost savings: Rp 243.69 million in Finance & HC, Rp 213.91 million in Engineering, and Rp 127.02 million in Commercial. These findings demonstrate that WIKA can enhance its operational performance and efficiency by implementing standardized job descriptions, optimal staffing levels, and accurate budget standards. Recommendations include adopting these standards across all medium project classifications and maintaining regular reviews to ensure continuous improvement, ultimately supporting sustainable growth in the construction industry.

International Journal of Current Science Research and ReviewVol. 07(08)
Bandung Institute of Technology (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 23%
Management and Optimization Techniques
0.55
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimization of Staffing Levels and Personnel Budgeting Through Standardized Job Descriptions and Workload Analysis: A Case Study of Operations Director 1's Projects at PT Wijaya Karya (Persero) TBK — Nur Budi Mulyono, Adibowo Wicaksono Wahyu Utomo · International Journal of Current Science Research and Review (2024) | TGRS Research Map | TGRS