Exploring the Enterprise BIM concept in practice: The case of Asset Management in a Norwegian hospital

Organizations face challenges in utilizing Building Information Modeling (BIM) for digital Asset Management (AM), as BIM from the design and construction phases often proves to be of limited use for AM. To address this, the concept of Enterprise BIM is introduced with the aim of organizing BIM activities throughout the lifecycle in line with the organization's operational and strategic needs. The article explores the current industry practices of implementing Enterprise BIM for effective AM support. It focuses on Vestfold Health Trust and its award-winning hospital project in Toensberg, Norway, which was notable for its use of Integrated Project Delivery (IPD) and its attempts to adopt Enterprise BIM methodologies and solutions. Through literature studies and interviews with fifteen key personnel, the article provides recommendations for significant improvement within several AM areas, such as expertise, technology utilization, standardization, solving end-users' information needs, ontological adaptation, and associated IT solutions needs. The results highlight the limitations of using the Industry Foundation Classes (IFC) schema and format for AM applications and suggest the development of flexible, searchable solutions based on ontologies and semantics to integrate sensor data into digital twins and asset information models. The study reveals a competency gap and deficiencies in information processes and IT solutions that organizations, along with the industry, must both address, emphasizing the use of international standards such as ISO 19650 to improve the integration of value chain considerations. Overall, this article provides valuable recommendations and a roadmap for the more strategic, holistic, and sustainable management of building information that aims to take into account and satisfy the end-user's information needs.

Authors

Institutions

Publication Details

Journal
Journal of Information Technology in Construction
Published
2024-08-16
DOI
https://doi.org/10.36680/j.itcon.2024.025
Citations
3
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.80
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Exploring the Enterprise BIM concept in practice: The case of Asset Management in a Norwegian hospital

Bjoern Godager, Knud Mohn, Christoph Merschbrock, Lizhen Huang
3 citations
Journal of Information Technology in Construction
BIM and Construction Integration
0.80
article

Exploring the Enterprise BIM concept in practice: The case of Asset Management in a Norwegian hospital

Bjoern Godager, Knud Mohn, Christoph Merschbrock, Lizhen Huang
article en
3 citations

Abstract

Organizations face challenges in utilizing Building Information Modeling (BIM) for digital Asset Management (AM), as BIM from the design and construction phases often proves to be of limited use for AM. To address this, the concept of Enterprise BIM is introduced with the aim of organizing BIM activities throughout the lifecycle in line with the organization's operational and strategic needs. The article explores the current industry practices of implementing Enterprise BIM for effective AM support. It focuses on Vestfold Health Trust and its award-winning hospital project in Toensberg, Norway, which was notable for its use of Integrated Project Delivery (IPD) and its attempts to adopt Enterprise BIM methodologies and solutions. Through literature studies and interviews with fifteen key personnel, the article provides recommendations for significant improvement within several AM areas, such as expertise, technology utilization, standardization, solving end-users' information needs, ontological adaptation, and associated IT solutions needs. The results highlight the limitations of using the Industry Foundation Classes (IFC) schema and format for AM applications and suggest the development of flexible, searchable solutions based on ontologies and semantics to integrate sensor data into digital twins and asset information models. The study reveals a competency gap and deficiencies in information processes and IT solutions that organizations, along with the industry, must both address, emphasizing the use of international standards such as ISO 19650 to improve the integration of value chain considerations. Overall, this article provides valuable recommendations and a roadmap for the more strategic, holistic, and sustainable management of building information that aims to take into account and satisfy the end-user's information needs.

Journal of Information Technology in ConstructionVol. 29
Norwegian University of Science and Technology (NO)
Industry, innovation and infrastructure
Openalex Percentile: Top 29%
BIM and Construction Integration
0.80
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Exploring the Enterprise BIM concept in practice: The case of Asset Management in a Norwegian hospital — Bjoern Godager, Knud Mohn, et al. · Journal of Information Technology in Construction (2024) | TGRS Research Map | TGRS