Interoperable mixed reality for facility management: a cyber-physical perspective

The management of building commissioning requires specialists from different organizations and with different skills. Collaboration processes involves several actors and decision-making at different levels. As building commissioning has already been described as systems-of-systems (SoS), the research reported in this paper claims that this definition can be extended into cyber-physical system-of-systems (CPSoS), requiring identification and support of both human-machine and machine-machine interactions in a hybrid environment. These requirements give rise to several challenges, such as capturing information about the existing facility, visualizing, comparing, and validating the compliance of alternative commissioning projects. The study presented in this paper reports methodological and technological solutions that are built on the integration between BIM and mixed reality, to actualize a CPSoS paradigm and to implement human-machine interaction for situated cognition towards an immersive collaborative working environment. The results of the experimental platform have been showcased in a full-scale real-life demonstrator.

Authors

Institutions

Publication Details

Journal
Journal of Information Technology in Construction
Published
2024-08-16
DOI
https://doi.org/10.36680/j.itcon.2024.026
Citations
2
Primary Topic
Digital Transformation in Industry
Type
article
Field-Weighted Citation Impact
0.70

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Interoperable mixed reality for facility management: a cyber-physical perspective

Alberto Giretti, Massimiliano Pirani, Francesco Spegni, Alessandro Carbonari et al.
2 citations
Journal of Information Technology in Construction
Digital Transformation in Industry
0.70
article

Interoperable mixed reality for facility management: a cyber-physical perspective

Alberto Giretti, Massimiliano Pirani, Francesco Spegni, Alessandro Carbonari, Massimo Vaccarini
article en
2 citations

Abstract

The management of building commissioning requires specialists from different organizations and with different skills. Collaboration processes involves several actors and decision-making at different levels. As building commissioning has already been described as systems-of-systems (SoS), the research reported in this paper claims that this definition can be extended into cyber-physical system-of-systems (CPSoS), requiring identification and support of both human-machine and machine-machine interactions in a hybrid environment. These requirements give rise to several challenges, such as capturing information about the existing facility, visualizing, comparing, and validating the compliance of alternative commissioning projects. The study presented in this paper reports methodological and technological solutions that are built on the integration between BIM and mixed reality, to actualize a CPSoS paradigm and to implement human-machine interaction for situated cognition towards an immersive collaborative working environment. The results of the experimental platform have been showcased in a full-scale real-life demonstrator.

Journal of Information Technology in ConstructionVol. 29
Marche Polytechnic University (IT)
European Commission
Openalex Percentile: Top 26%
Digital Transformation in Industry
0.70
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.