Comparative Study of Heat Transfer Simulation and Effects of Different Scrap Steel Preheating Methods

The materials charged into a converter comprise molten iron and scrap steel. Adjusting the ratio by increasing scrap steel and decreasing molten iron is a steelmaking raw material strategy designed specifically for China’s unique circumstances, with the goal of lowering carbon emissions. To maintain the converter tapping temperature, scrap must be preheated to provide additional heat. Current scrap preheating predominantly utilizes horizontal tunnel furnaces, resulting in high energy consumption and low efficiency. To address these issues, a three-stage shaft furnace for scrap preheating was designed, and Fluent software was used to compare and study the preheating efficiency of the new three-stage furnace against the traditional horizontal furnace under various operational conditions. Initially, a three-dimensional transient multi-field coupling model was developed for two scrap preheating scenarios, examining the effects of both furnaces on scrap surface and core temperatures across varying preheating durations and gas velocities. Simulation results indicate that, under identical gas heat consumption conditions, scrap achieves markedly higher final temperatures in the shaft furnace compared to the horizontal furnace, with scrap surface and core temperatures increasing notably with extended preheating times and higher gas velocities, albeit with a gradual decrease in heating rate as the scrap temperature rises. At a gas velocity of 9 m/s and a preheating time of 600 s, the shaft furnace achieves the highest waste heat utilization rate for scrap, with scrap averaging 325 °C higher than in the horizontal furnace, absorbing an additional 202 MJ of heat per ton. In the horizontal preheating furnace, scrap steel exhibits a heat absorption efficiency of 35%, whereas in the vertical furnace, this efficiency increases notably to 63%. In the vertical furnace, the waste heat recovery rate of scrap steel reaches 57%.

Authors

Institutions

Publication Details

Journal
Metals
Published
2024-08-12
DOI
https://doi.org/10.3390/met14080913
Citations
4
Primary Topic
Metallurgical Processes and Thermodynamics
Type
article
Field-Weighted Citation Impact
0.85
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparative Study of Heat Transfer Simulation and Effects of Different Scrap Steel Preheating Methods

Pengcheng Xiao, Liguang Zhu, Rong Zhu, Chao Wang et al.
4 citations
Metals
Metallurgical Processes and Thermodynamics
0.85
article

Comparative Study of Heat Transfer Simulation and Effects of Different Scrap Steel Preheating Methods

Pengcheng Xiao, Liguang Zhu, Rong Zhu, Chao Wang, Yuxin Jin
article en
4 citations

Abstract

The materials charged into a converter comprise molten iron and scrap steel. Adjusting the ratio by increasing scrap steel and decreasing molten iron is a steelmaking raw material strategy designed specifically for China’s unique circumstances, with the goal of lowering carbon emissions. To maintain the converter tapping temperature, scrap must be preheated to provide additional heat. Current scrap preheating predominantly utilizes horizontal tunnel furnaces, resulting in high energy consumption and low efficiency. To address these issues, a three-stage shaft furnace for scrap preheating was designed, and Fluent software was used to compare and study the preheating efficiency of the new three-stage furnace against the traditional horizontal furnace under various operational conditions. Initially, a three-dimensional transient multi-field coupling model was developed for two scrap preheating scenarios, examining the effects of both furnaces on scrap surface and core temperatures across varying preheating durations and gas velocities. Simulation results indicate that, under identical gas heat consumption conditions, scrap achieves markedly higher final temperatures in the shaft furnace compared to the horizontal furnace, with scrap surface and core temperatures increasing notably with extended preheating times and higher gas velocities, albeit with a gradual decrease in heating rate as the scrap temperature rises. At a gas velocity of 9 m/s and a preheating time of 600 s, the shaft furnace achieves the highest waste heat utilization rate for scrap, with scrap averaging 325 °C higher than in the horizontal furnace, absorbing an additional 202 MJ of heat per ton. In the horizontal preheating furnace, scrap steel exhibits a heat absorption efficiency of 35%, whereas in the vertical furnace, this efficiency increases notably to 63%. In the vertical furnace, the waste heat recovery rate of scrap steel reaches 57%.

MetalsVol. 14(8)
North China University of Science and Technology (CN), Hebei University of Science and Technology (CN), HBIS (China) (CN), University of Science and Technology Beijing (CN)
Affordable and clean energy
Openalex Percentile: Top 31%
Metallurgical Processes and Thermodynamics
0.85
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.