Preliminary Computations for Pulsed Reactor IBR-4. Basic Design
The IBR-2M reactor is scheduled for decommissioning at end of the 2030s. We propose, after the reactor is decommissioned, not to create an absolutely new neutron source, which would require significant R&D efforts, but use instead effective technical solutions tested at other fast neutron nuclear facilities, for example, IBR-2, IBR-2M, MBIR, BOR-60, BN-1200, etc. This is a conceptual vision of a new source, the tentative name of which is IBR-4. The study based on calculations for the so-called basic setup of the IBR-4 considers the fundamental feasibility of implementing effective technical solutions.
Authors
- Yu. N. Pepelyshev
- A. Vinogradov (ORCID: https://orcid.org/0000-0002-7633-8660)
- D. Sumkhuu
- A. D. Rogov
Institutions
- Mongolian Academy of Sciences (MN)
- Joint Institute for Nuclear Research (RU)
- Institute of Physics and Technology (MN)
Publication Details
- Journal
- Physics of Particles and Nuclei Letters
- Published
- 2024-08-01
- DOI
- https://doi.org/10.1134/s1547477124701024
- Citations
- 1
- Primary Topic
- Nuclear reactor physics and engineering
- Type
- article
- Field-Weighted Citation Impact
- 1.30