Time Cost Trade-Off Problem Using Intuitionistic Fuzzy with Real Time Application in the Field of Construction

In order to assist in locating the critical path in an acyclic network, the Critical Path Method (CPM) employs intuitionistic triangular fuzzy number. Project crashing is a technique used to cut the project timeline fast by minimizing the duration of one or more critical task below their typical duration. The goal of crashing, often referred to as the time-cost trade-off, is to shorten the project’s duration while lowering its cost. The intuitionistic fuzzy critical path technique and the time-cost trade-off issue were developed as a result of the uncertainty or ambiguity around the length of activities. The present investigation proposes an optimal method for handling the time-cost trade-off problem (TCTP). When the duration aspect is taken into account, the project’s overall cost is effectively reduced. It is simpler to compute the time and monetary expenses of being on the critical path while using this approach. An existing application from the literature is selected and implemented to demonstrate the operation of this technology. Additionally, we suggested a ranking method for defuzzification called “Magnitude measure”. Both the traditional approach and the path length ranking methodology are used for verification. MATLAB is used to give simulation results.

Authors

Institutions

Publication Details

Journal
Contemporary Mathematics
Published
2024-08-08
DOI
https://doi.org/10.37256/cm.5320243727
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.27
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Time Cost Trade-Off Problem Using Intuitionistic Fuzzy with Real Time Application in the Field of Construction

G. Deepa, S Priyadharshini
1 citations
Contemporary Mathematics
BIM and Construction Integration
0.27
article

Time Cost Trade-Off Problem Using Intuitionistic Fuzzy with Real Time Application in the Field of Construction

G. Deepa, S Priyadharshini
article en
1 citations

Abstract

In order to assist in locating the critical path in an acyclic network, the Critical Path Method (CPM) employs intuitionistic triangular fuzzy number. Project crashing is a technique used to cut the project timeline fast by minimizing the duration of one or more critical task below their typical duration. The goal of crashing, often referred to as the time-cost trade-off, is to shorten the project’s duration while lowering its cost. The intuitionistic fuzzy critical path technique and the time-cost trade-off issue were developed as a result of the uncertainty or ambiguity around the length of activities. The present investigation proposes an optimal method for handling the time-cost trade-off problem (TCTP). When the duration aspect is taken into account, the project’s overall cost is effectively reduced. It is simpler to compute the time and monetary expenses of being on the critical path while using this approach. An existing application from the literature is selected and implemented to demonstrate the operation of this technology. Additionally, we suggested a ranking method for defuzzification called “Magnitude measure”. Both the traditional approach and the path length ranking methodology are used for verification. MATLAB is used to give simulation results.

Contemporary Mathematics
Vellore Institute of Technology University (IN)
Openalex Percentile: Top 45%
BIM and Construction Integration
0.27
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.