Study on cracking mechanism and key parameters of roof in gob-side entry retaining by pre-split blasting roof in deep mine

Based on 7135 working face of Qidong Coal Mine, the cracking mechanism of pre-splitting of gob-side entry retaining by roof cutting and the key parameters of pre-splitting blasting are studied by means of theoretical analysis, numerical simulation, and on-site measurement. Under the same blasting conditions, the energy of shaped-charge blasting in the direction of shaped charge is much larger than that of non-shaped-charge blasting, and the cracks generated along the direction of shaped charge are longer than that of non-shaped-charge blasting. The key parameters of pre-splitting cracks are the hole spacing and charge length. The crack propagation law of two holes blasting at the same time with different blasting methods, different linear charge density, and different hole spacing is studied. It is obtained that the cracking effect of shaped-charge blasting with the same hole spacing is better than that of non-shaped-charge blasting, showing that it can form part-through cracks; Increasing the linear charge density can increase the crack distance, but also destroy the integrity of the retained rock mass. The key parameters of advanced pre-splitting blasting in engineering practice are put forward. Generally, the maximum hole spacing and the minimum charge length that can produce part-through cracks are selected. When the hole spacing is 600 mm and the charge length is 4 m, the crack propagation of roof and the stress change of anchor cable after blasting are measured, and the crack formation rate reaches 86% to 90% within the blasting depth of blasting hole, and the anchor cable is in a good stress state, which can effectively control the roof. The research results provide a theoretical basis for the parameter design of pre-splitting blasting cracking of gob-side entry retaining by roof cutting.

Authors

Institutions

Publication Details

Journal
Energy Exploration & Exploitation
Published
2024-08-09
DOI
https://doi.org/10.1177/01445987241269551
Citations
3
Primary Topic
Geomechanics and Mining Engineering
Type
article
Field-Weighted Citation Impact
0.81

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on cracking mechanism and key parameters of roof in gob-side entry retaining by pre-split blasting roof in deep mine

Xueqiu He, Yuntao Liang, Xinzhu Hua, Chen Li et al.
3 citations
Energy Exploration & Exploitation
Geomechanics and Mining Engineering
0.81
article

Study on cracking mechanism and key parameters of roof in gob-side entry retaining by pre-split blasting roof in deep mine

Xueqiu He, Yuntao Liang, Xinzhu Hua, Chen Li, Liu Xiao
article en
3 citations

Abstract

Based on 7135 working face of Qidong Coal Mine, the cracking mechanism of pre-splitting of gob-side entry retaining by roof cutting and the key parameters of pre-splitting blasting are studied by means of theoretical analysis, numerical simulation, and on-site measurement. Under the same blasting conditions, the energy of shaped-charge blasting in the direction of shaped charge is much larger than that of non-shaped-charge blasting, and the cracks generated along the direction of shaped charge are longer than that of non-shaped-charge blasting. The key parameters of pre-splitting cracks are the hole spacing and charge length. The crack propagation law of two holes blasting at the same time with different blasting methods, different linear charge density, and different hole spacing is studied. It is obtained that the cracking effect of shaped-charge blasting with the same hole spacing is better than that of non-shaped-charge blasting, showing that it can form part-through cracks; Increasing the linear charge density can increase the crack distance, but also destroy the integrity of the retained rock mass. The key parameters of advanced pre-splitting blasting in engineering practice are put forward. Generally, the maximum hole spacing and the minimum charge length that can produce part-through cracks are selected. When the hole spacing is 600 mm and the charge length is 4 m, the crack propagation of roof and the stress change of anchor cable after blasting are measured, and the crack formation rate reaches 86% to 90% within the blasting depth of blasting hole, and the anchor cable is in a good stress state, which can effectively control the roof. The research results provide a theoretical basis for the parameter design of pre-splitting blasting cracking of gob-side entry retaining by roof cutting.

Energy Exploration & ExploitationVol. 43(1)
Anhui University of Science and Technology (CN), CCTEG Shenyang Research Institute (CN), China Coal Research Institute (China) (CN), State Key Laboratory of Coal Mine Safety Technology, University of Science and Technology Beijing (CN)
National Natural Science Foundation of China
Sustainable cities and communities
Openalex Percentile: Top 33%
Geomechanics and Mining Engineering
0.81
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.