Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system

Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.

Authors

Institutions

Publication Details

Journal
Energy Reports
Published
2024-08-08
DOI
https://doi.org/10.1016/j.egyr.2024.08.003
Citations
4
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.83
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system

George Xydis, Jasmin Søgaard-Deakin
4 citations
Energy Reports
Integrated Energy Systems Optimization
0.83
article

Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system

George Xydis, Jasmin Søgaard-Deakin
article en
4 citations

Abstract

Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.

Energy ReportsVol. 12
University of Peloponnese (GR), Aarhus University (DK)
Affordable and clean energy
Openalex Percentile: Top 27%
Integrated Energy Systems Optimization
0.83
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system — George Xydis, Jasmin Søgaard-Deakin · Energy Reports (2024) | TGRS Research Map | TGRS