Prefeasibility study on optimal site location for Power‐to‐X: An experiment for the Danish energy system
Denmark has set ambitious goals to cut greenhouse gas emissions by 70 % by the year 2030, and in an effort to reach this, the Danish Energy Agency has proposed a Power-to-X strategy that involves an overall capacity target of 6 GW of electrolysis by 2030. The objective of the following study was to identify the optimal site location for siting an electrolyser for Power-to-X as a prefeasibility analysis. The results indicated that Jammerbugt was an ideal area, for an add on solution to an already existing wind turbine, with 1303 h of excess wind energy available for Power-to-X. A financial analysis showed that there was an NPV of - €126,032 after a 20-year period, which improves with a theoretical 20 % governmental subsidy to €16,662. Therefore, it was found that Power-to-X is still currently reliant on governmental support as a viable business case. The study's findings highlight the importance of this support for Power-to-X to be a viable business case, such as the decision to allocate 1.25 billion DKK for hydrogen production by 2030.
Authors
- George Xydis (ORCID: https://orcid.org/0000-0002-3662-1832)
- Jasmin Søgaard-Deakin
Institutions
- University of Peloponnese (GR)
- Aarhus University (DK)
Publication Details
- Journal
- Energy Reports
- Published
- 2024-08-08
- DOI
- https://doi.org/10.1016/j.egyr.2024.08.003
- Citations
- 4
- Primary Topic
- Integrated Energy Systems Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.83