Managing Dynamic Project Assumptions Prior to Freezing of Scope: Niger Delta Case Studies

Abstract A key objective of the shaping process in project maturation is to ensure that once the scope is defined, there will be minimal or no further changes as we get into the execution stage. As part of the shaping process, which is typically from the time the project is conceived to the freezing of the scope, changes can occur when the underlying assumptions change. Two key export gas projects in focus, recently went through the shaping process. The projects were matured via a gated process, which involved passing key project milestone decision gates through an internal Decision Review Board (DRB). In the maturation process, a Feasibility gate precede another gate that indicates the freezing of the scope (otherwise known as FEL2, front end loading 2). A fourth decision gate (FEL3) signals support for the final investment decision (FID) which precedes the execution stage. During the shaping process, both projects passed the feasibility gate with an identified concept that could potentially be progressed to the scope freeze gate. Post the feasibility studies, some technical assumptions changed and challenged the feasibility of the projects. One of the projects recovered with a redefined scope that was still in line with the original frame, while the other struggled. This paper examines in detail the changes in the technical assumptions that challenged the already proven feasibility of these projects. The objective is to see if these challenges could have been anticipated (via better risk assessments, better framing of the projects and better anticipation of external stakeholders’ perspectives) and addressed earlier to avoid such outcomes where projects initially assessed as feasible turn out to be otherwise before the scope freeze decision gate.

Authors

Institutions

Publication Details

Journal
SPE Nigeria Annual International Conference and Exhibition
Published
2024-08-05
DOI
https://doi.org/10.2118/221633-ms
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Managing Dynamic Project Assumptions Prior to Freezing of Scope: Niger Delta Case Studies

Peter Obidike, Adenike Sonde
SPE Nigeria Annual International Conference and Exhibition
Construction Project Management and Performance
article

Managing Dynamic Project Assumptions Prior to Freezing of Scope: Niger Delta Case Studies

Peter Obidike, Adenike Sonde
article en

Abstract

Abstract A key objective of the shaping process in project maturation is to ensure that once the scope is defined, there will be minimal or no further changes as we get into the execution stage. As part of the shaping process, which is typically from the time the project is conceived to the freezing of the scope, changes can occur when the underlying assumptions change. Two key export gas projects in focus, recently went through the shaping process. The projects were matured via a gated process, which involved passing key project milestone decision gates through an internal Decision Review Board (DRB). In the maturation process, a Feasibility gate precede another gate that indicates the freezing of the scope (otherwise known as FEL2, front end loading 2). A fourth decision gate (FEL3) signals support for the final investment decision (FID) which precedes the execution stage. During the shaping process, both projects passed the feasibility gate with an identified concept that could potentially be progressed to the scope freeze gate. Post the feasibility studies, some technical assumptions changed and challenged the feasibility of the projects. One of the projects recovered with a redefined scope that was still in line with the original frame, while the other struggled. This paper examines in detail the changes in the technical assumptions that challenged the already proven feasibility of these projects. The objective is to see if these challenges could have been anticipated (via better risk assessments, better framing of the projects and better anticipation of external stakeholders’ perspectives) and addressed earlier to avoid such outcomes where projects initially assessed as feasible turn out to be otherwise before the scope freeze decision gate.

SPE Nigeria Annual International Conference and Exhibition
Shell (Germany) (DE)
Partnerships for the goals
Openalex Percentile: Top 81%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.