Tunnel System Made by the Long-Clawed Shrew in a Laboratory Condition

Tunnel construction by captive long-clawed shrews (Sorex unguiculatus) was investigated in an experimental cage designed for the observation of subterranean activity. Five subadult individuals were observed constructing tunnel systems in the experimental cage, but one newborn individual could not make a complex system. The tunnel system consisted of two parts: the main burrows at a depth of approximately 20–30 cm from the ground surface and surface runways at a depth of 3–7 cm. In a tunnel system, there were 2–4 permanent vertical passages with entrances to the ground surface and 3–5 blind chambers and burrows. To complete the tunnel system construction, a shrew usually spent 5–6 days. Two types of digging were recognized: (1) digging surface runways and short vertical passages and (2) digging deep tunnels. Published online 5 August, 2024; Print publication 31 October, 2024

Authors

Institutions

Publication Details

Journal
Mammal Study
Published
2024-08-05
DOI
https://doi.org/10.3106/ms2023-0046
Primary Topic
Bat Biology and Ecology Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Tunnel System Made by the Long-Clawed Shrew in a Laboratory Condition

V. A. Nesterenko, Satoshi D. Ohdachi
Mammal Study
Bat Biology and Ecology Studies
article

Tunnel System Made by the Long-Clawed Shrew in a Laboratory Condition

V. A. Nesterenko, Satoshi D. Ohdachi
article en

Abstract

Tunnel construction by captive long-clawed shrews (Sorex unguiculatus) was investigated in an experimental cage designed for the observation of subterranean activity. Five subadult individuals were observed constructing tunnel systems in the experimental cage, but one newborn individual could not make a complex system. The tunnel system consisted of two parts: the main burrows at a depth of approximately 20–30 cm from the ground surface and surface runways at a depth of 3–7 cm. In a tunnel system, there were 2–4 permanent vertical passages with entrances to the ground surface and 3–5 blind chambers and burrows. To complete the tunnel system construction, a shrew usually spent 5–6 days. Two types of digging were recognized: (1) digging surface runways and short vertical passages and (2) digging deep tunnels. Published online 5 August, 2024; Print publication 31 October, 2024

Mammal StudyVol. 49(4)
Hokkaido University (JP), Federal Scientific Center of the East Asia Terrestrial Biodiversity FEB RAS (RU)
Openalex Percentile: Top 91%
Bat Biology and Ecology Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Tunnel System Made by the Long-Clawed Shrew in a Laboratory Condition — V. A. Nesterenko, Satoshi D. Ohdachi · Mammal Study (2024) | TGRS Research Map | TGRS