Predicting construction schedule overruns during COVID-19 using ordinal logistic regression

Purpose The effects of the COVID-19 outbreak on the construction industry were formidable and far-reaching, as the construction sector is a major contributor to the gross domestic product (GDP), which balances various sectors of the global economy, and to infrastructure growth, which is a primary gauge of a nation’s advancement. The outbreak led to workforce disruptions, worker deficits, dwindling efficiency, elongated project durations, and scarce opportunities for training and mentorship, and despite endeavors to mitigate these challenges, construction timelines experienced significant interruptions. Various researchers have pinpointed contributing elements, but few have constructed a predictive model to gauge the degree of impact. Design/methodology/approach Therefore, this research intends to fill by introducing an ordinal logistic regression method to forecast the impacts of a pandemic or other similar type of crisis. To achieve this, an online survey was developed and distributed to collect the perceptions of the construction engineers and managers about the diverse contributors to the exceeding project timelines during the COVID-19 pandemic outbreak. Findings Findings from this study indicate that financial liquidity, modifications to original plans, delays in securing governmental clearances, and a shortage of competent labor have medium-to-high levels of impact on project schedules. Originality/value This study will furnish decision-makers with crucial knowledge that will give them the tools to refine their strategies and judiciously allocate resources to overcome the unique hurdles encountered by various construction segments and will enhance the industry's capability to respond more effectively to challenges inherent in this type of crisis.

Authors

Institutions

Publication Details

Journal
International Journal of Building Pathology and Adaptation
Published
2024-08-05
DOI
https://doi.org/10.1108/ijbpa-11-2023-0161
Citations
2
Primary Topic
COVID-19 Pandemic Impacts
Type
article
Field-Weighted Citation Impact
2.26
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Predicting construction schedule overruns during COVID-19 using ordinal logistic regression

Apurva Pamidimukkala, Sharareh Kermanshachi, Nikhitha Adepu, Emily Nwakpuda
2 citations
International Journal of Building Pathology and Adaptation
COVID-19 Pandemic Impacts
2.26
article

Predicting construction schedule overruns during COVID-19 using ordinal logistic regression

Apurva Pamidimukkala, Sharareh Kermanshachi, Nikhitha Adepu, Emily Nwakpuda
article en
2 citations

Abstract

Purpose The effects of the COVID-19 outbreak on the construction industry were formidable and far-reaching, as the construction sector is a major contributor to the gross domestic product (GDP), which balances various sectors of the global economy, and to infrastructure growth, which is a primary gauge of a nation’s advancement. The outbreak led to workforce disruptions, worker deficits, dwindling efficiency, elongated project durations, and scarce opportunities for training and mentorship, and despite endeavors to mitigate these challenges, construction timelines experienced significant interruptions. Various researchers have pinpointed contributing elements, but few have constructed a predictive model to gauge the degree of impact. Design/methodology/approach Therefore, this research intends to fill by introducing an ordinal logistic regression method to forecast the impacts of a pandemic or other similar type of crisis. To achieve this, an online survey was developed and distributed to collect the perceptions of the construction engineers and managers about the diverse contributors to the exceeding project timelines during the COVID-19 pandemic outbreak. Findings Findings from this study indicate that financial liquidity, modifications to original plans, delays in securing governmental clearances, and a shortage of competent labor have medium-to-high levels of impact on project schedules. Originality/value This study will furnish decision-makers with crucial knowledge that will give them the tools to refine their strategies and judiciously allocate resources to overcome the unique hurdles encountered by various construction segments and will enhance the industry's capability to respond more effectively to challenges inherent in this type of crisis.

International Journal of Building Pathology and AdaptationVol. 44(1)
The University of Texas at Arlington (US)
Industry, innovation and infrastructure
Openalex Percentile: Top 8%
COVID-19 Pandemic Impacts
2.26
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Predicting construction schedule overruns during COVID-19 using ordinal logistic regression — Apurva Pamidimukkala, Sharareh Kermanshachi, et al. · International Journal of Building Pathology and Adaptation (2024) | TGRS Research Map | TGRS