OPTIMIZATION OF MIB-02 WELL BY CONVERTING THE ACTIVATION MODE USING PROSPER SOFTWARE

Mibale oil field considered a mature oil field, located offshore in the coastal basin of the DR Congo and discovered in 1973, has seen an evolution in its production since it began operation in 1976, starting from an initial rate of 10,000 BOPD with 3 producing wells to the current production of 5,905 BOPD from 14 wells. In 2021, the field had 393 MMstb of oil reserves in the reservoir. A thorough study of the production system was carried out, focusing on the five best producing wells, including well MIB-02. Despite traversing layers of the reservoir with high oil potential, the well is underperforming with a respective flow rate of 351 BOPD and a 60% WOR using an electric submersible pump. Following this low production, various studies were conducted, including the study on converting the activation method by proceeding with nodal analysis technique. The use of nodal analysis proved crucial in identifying the shortcomings of the production system, combining field history with analysis of production, well test, pressure, and completion data. The IPM Prosper software enabled a thorough analysis, revealing that MIB-02 had a production potential greater than its current performance. This performance was revealed after evaluation and interpretation of IPR, VLP curves and sensitivities of variables such as water cut and pressure at the first node. After interpreting these curves, the MIB-02 well had the production capacity of 4100.62 BOPD and 12463.9 BWPD. By converting the submersible electric pump activation mode to gas-lift and exploring various scenarios, production was improved with an oil flow rate of 1244.9 BOPD, water flow of 2539 BWPD, to a gas flow of 0.37346 MMscf/day and 67.1% water cut. Despite these improvements, excessive water production remains a challenge while also highlighting the complexity of the production system and the limitations of the analysis technique. Therefore, further studies can be envisaged by modeling and simulating the reservoir, considering well interventions and quantifying the remaining reserves today. This more comprehensive approach will enable a clearer vision and help decide the best optimization strategies for the Mibale field production system.

Authors

Publication Details

Journal
Romanian Journal of Petroleum & Gas Technology
Published
2024-08-05
DOI
https://doi.org/10.51865/jpgt.2024.01.13
Citations
1
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.34
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OPTIMIZATION OF MIB-02 WELL BY CONVERTING THE ACTIVATION MODE USING PROSPER SOFTWARE

Joël Kabesa Kilungu, Dominique Wetshondo Osomba, Joseph Lukola Empenga
1 citations
Romanian Journal of Petroleum & Gas Technology
Drilling and Well Engineering
0.34
article

OPTIMIZATION OF MIB-02 WELL BY CONVERTING THE ACTIVATION MODE USING PROSPER SOFTWARE

Joël Kabesa Kilungu, Dominique Wetshondo Osomba, Joseph Lukola Empenga
article en
1 citations

Abstract

Mibale oil field considered a mature oil field, located offshore in the coastal basin of the DR Congo and discovered in 1973, has seen an evolution in its production since it began operation in 1976, starting from an initial rate of 10,000 BOPD with 3 producing wells to the current production of 5,905 BOPD from 14 wells. In 2021, the field had 393 MMstb of oil reserves in the reservoir. A thorough study of the production system was carried out, focusing on the five best producing wells, including well MIB-02. Despite traversing layers of the reservoir with high oil potential, the well is underperforming with a respective flow rate of 351 BOPD and a 60% WOR using an electric submersible pump. Following this low production, various studies were conducted, including the study on converting the activation method by proceeding with nodal analysis technique. The use of nodal analysis proved crucial in identifying the shortcomings of the production system, combining field history with analysis of production, well test, pressure, and completion data. The IPM Prosper software enabled a thorough analysis, revealing that MIB-02 had a production potential greater than its current performance. This performance was revealed after evaluation and interpretation of IPR, VLP curves and sensitivities of variables such as water cut and pressure at the first node. After interpreting these curves, the MIB-02 well had the production capacity of 4100.62 BOPD and 12463.9 BWPD. By converting the submersible electric pump activation mode to gas-lift and exploring various scenarios, production was improved with an oil flow rate of 1244.9 BOPD, water flow of 2539 BWPD, to a gas flow of 0.37346 MMscf/day and 67.1% water cut. Despite these improvements, excessive water production remains a challenge while also highlighting the complexity of the production system and the limitations of the analysis technique. Therefore, further studies can be envisaged by modeling and simulating the reservoir, considering well interventions and quantifying the remaining reserves today. This more comprehensive approach will enable a clearer vision and help decide the best optimization strategies for the Mibale field production system.

Romanian Journal of Petroleum & Gas TechnologyVol. 5 (76)(1)
Clean water and sanitation, Life below water
Openalex Percentile: Top 43%
Drilling and Well Engineering
0.34
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

OPTIMIZATION OF MIB-02 WELL BY CONVERTING THE ACTIVATION MODE USING PROSPER SOFTWARE — Joël Kabesa Kilungu, Dominique Wetshondo Osomba, et al. · Romanian Journal of Petroleum & Gas Technology (2024) | TGRS Research Map | TGRS