Research on workshop self-inspection task scheduling based on bi-level genetic algorithm
This article is based on the rolling time domain optimization strategy, with the objective of achieving the best comprehensive result by minimizing the shortest time and maximizing the total priority of scheduling tasks. It designs a scheduling optimization strategy for situations where production equipment failures occur. The bi-level genetic algorithm is used to solve the production scheduling problem in the workshop. Finally, through simulation on instances of the production workshop, it verifies that this scheduling strategy can effectively solve the dynamic scheduling problem in the workshop.
Authors
- Xiaoning Yu (ORCID: https://orcid.org/0009-0001-9842-2783)
- Hongyu Guo (ORCID: https://orcid.org/0000-0002-6969-5424)
- Songjiang Peng
Institutions
- Zhengzhou Institute of Machinery (CN)
Publication Details
- Published
- 2024-08-05
- DOI
- https://doi.org/10.1117/12.3039272
- Primary Topic
- Manufacturing Process and Optimization
- Type
- article
- Field-Weighted Citation Impact
- 0.00