Why the US Needs an Enduring Plutonium Critical Assembly

Jezebel (operated from 1954-1977) has been the primary experiment for fast <sup>239</sup>Pu nuclear data validation for the last 70 years. Validation has included not only k<sub>eff</sub>, but also spectral indicies, Rossi-α, reactivity coefficients, and neutron leakage spectra. While this has been incredibly valuable to the community, there are three major issues. The first issue is that documentation on many of these experiments were lacking, leading to large uncertainties or (even worse) incorrect assumptions. The second issue is that while there have been many advances in research, there is no way to test those new advances today. The last issue is that since the assembly only operated for 23 years (and at time when 30 other critical assemblies were operating at the same facility and nuclear weapons testing was occurring), there were limited opportunities to observe how any system parameters changed as a function of time. Note that this work is not suggesting that a "Jezebel re placement" used for a limited experiment campaign would have great value. A new enduring (100 year target) plutonium (Pu) assembly with simple geometry and low uncertainties, however, would be extremely valuable. Such a capability would have a transformative impact on many research areas including nuclear data validation, analytical methods validation, dosimetry, reactor kinetics, and materials. The need for a new plutonium assembly is not new: it has been in the DOE Nuclear Criticality Safety Program (NCSP) Mission and Vision for over 10 years and was also the top priority established at the 2022 National Criticality Experiments Research Center (NCERC) Futures meeting. This work will discuss how such a new capability would help ensure that the US retains international leadership in plutonium research. Last, a brief overview of Lilith, a project aimed to design a new enduring plutonium assembly for operation at the NCERC will be given.

Authors

Institutions

Publication Details

Journal
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Published
2024-08-20
Primary Topic
Nuclear and radioactivity studies
Type
article

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Why the US Needs an Enduring Plutonium Critical Assembly

Karl J. Friston
OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Nuclear and radioactivity studies
article

Why the US Needs an Enduring Plutonium Critical Assembly

Karl J. Friston
article en

Abstract

Jezebel (operated from 1954-1977) has been the primary experiment for fast <sup>239</sup>Pu nuclear data validation for the last 70 years. Validation has included not only k<sub>eff</sub>, but also spectral indicies, Rossi-α, reactivity coefficients, and neutron leakage spectra. While this has been incredibly valuable to the community, there are three major issues. The first issue is that documentation on many of these experiments were lacking, leading to large uncertainties or (even worse) incorrect assumptions. The second issue is that while there have been many advances in research, there is no way to test those new advances today. The last issue is that since the assembly only operated for 23 years (and at time when 30 other critical assemblies were operating at the same facility and nuclear weapons testing was occurring), there were limited opportunities to observe how any system parameters changed as a function of time. Note that this work is not suggesting that a "Jezebel re placement" used for a limited experiment campaign would have great value. A new enduring (100 year target) plutonium (Pu) assembly with simple geometry and low uncertainties, however, would be extremely valuable. Such a capability would have a transformative impact on many research areas including nuclear data validation, analytical methods validation, dosimetry, reactor kinetics, and materials. The need for a new plutonium assembly is not new: it has been in the DOE Nuclear Criticality Safety Program (NCSP) Mission and Vision for over 10 years and was also the top priority established at the 2022 National Criticality Experiments Research Center (NCERC) Futures meeting. This work will discuss how such a new capability would help ensure that the US retains international leadership in plutonium research. Last, a brief overview of Lilith, a project aimed to design a new enduring plutonium assembly for operation at the NCERC will be given.

OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information)
Los Alamos National Laboratory (US)
U.S. Department of Energy, National Nuclear Security Administration, Laboratory Directed Research and Development, Los Alamos National Laboratory
Climate action
Nuclear and radioactivity studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Why the US Needs an Enduring Plutonium Critical Assembly — Karl J. Friston · OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) (2024) | TGRS Research Map | TGRS