Managing subsurface risk for Toronto's Rapid Transit Expansion Program

The design and construction strategy adopted to manage subsurface risks on Toronto’s Rapid Transit Expansion Program are described. Measures include a “risk sharing” approach to construction contracts, a commitment to comprehensive pre-construction site investigation and appointment of a Program Geotechnical Consultant. The role of the Program Geotechnical Consultant in planning investigations, ensuring consistency in quality and providing a consistent interpretation of subsurface data is described. The level of site investigation effort for the major tunnelling contracts is related to construction risks, such as change orders, to assess the optimum level of investigative effort. The “risk sharing” approach to construction requires preparation of a Geotechnical Baseline Report and the appointment of a Disputes Review Board for each major civil works contract. The approach to providing “baseline” conditions for typically contentious issues, like boulder frequency, is described.

Authors

Publication Details

Published
2026-01-21
DOI
https://doi.org/10.1201/9781003761792-5
Citations
5
Primary Topic
Underground infrastructure and sustainability
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Managing subsurface risk for Toronto's Rapid Transit Expansion Program

J R Busbridge, Jason Westland, Jim Ball
5 citations
Underground infrastructure and sustainability
article

Managing subsurface risk for Toronto's Rapid Transit Expansion Program

J R Busbridge, Jason Westland, Jim Ball
article en
5 citations

Abstract

The design and construction strategy adopted to manage subsurface risks on Toronto’s Rapid Transit Expansion Program are described. Measures include a “risk sharing” approach to construction contracts, a commitment to comprehensive pre-construction site investigation and appointment of a Program Geotechnical Consultant. The role of the Program Geotechnical Consultant in planning investigations, ensuring consistency in quality and providing a consistent interpretation of subsurface data is described. The level of site investigation effort for the major tunnelling contracts is related to construction risks, such as change orders, to assess the optimum level of investigative effort. The “risk sharing” approach to construction requires preparation of a Geotechnical Baseline Report and the appointment of a Disputes Review Board for each major civil works contract. The approach to providing “baseline” conditions for typically contentious issues, like boulder frequency, is described.

Openalex Percentile: Top 99%
Underground infrastructure and sustainability
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.