Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling

Abstract In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests are performed by qualified personnel using specialised equipment, while respecting deadlines and other constraints. We present different constraint programming models and search strategies for this problem. Furthermore, we propose a Very Large Neighborhood Search approach based on our CP methods. Our models are evaluated using CP solvers and a MIP solver both on real-world test laboratory data and on a set of generated instances of different sizes based on the real-world data. Further, we compare the exact approaches with VLNS and a Simulated Annealing heuristic. We could find feasible solutions for all instances and several optimal solutions and we show that using VLNS we can improve upon the results of the other approaches.

Authors

Institutions

Publication Details

Journal
Journal of Scheduling
Published
2024-10-14
DOI
https://doi.org/10.1007/s10951-024-00821-0
Citations
5
Primary Topic
Resource-Constrained Project Scheduling
Type
article
Field-Weighted Citation Impact
1.47

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling

Florian Mischek, Tobias Geibinger, Nysret Musliu
5 citations
Journal of Scheduling
Resource-Constrained Project Scheduling
1.47
article

Investigating constraint programming and hybrid methods for real world industrial test laboratory scheduling

Florian Mischek, Tobias Geibinger, Nysret Musliu
article en
5 citations

Abstract

Abstract In this paper we deal with a complex real world scheduling problem closely related to the well-known Resource-Constrained Project Scheduling Problem (RCPSP). The problem concerns industrial test laboratories in which a large number of tests are performed by qualified personnel using specialised equipment, while respecting deadlines and other constraints. We present different constraint programming models and search strategies for this problem. Furthermore, we propose a Very Large Neighborhood Search approach based on our CP methods. Our models are evaluated using CP solvers and a MIP solver both on real-world test laboratory data and on a set of generated instances of different sizes based on the real-world data. Further, we compare the exact approaches with VLNS and a Simulated Annealing heuristic. We could find feasible solutions for all instances and several optimal solutions and we show that using VLNS we can improve upon the results of the other approaches.

Journal of SchedulingVol. 27(6)
TU Wien (AT)
Christian Doppler Forschungsgesellschaft
Industry, innovation and infrastructure
Openalex Percentile: Top 19%
Resource-Constrained Project Scheduling
1.47
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.