SIMULATION BASED RELIABILITY GROWTH PLANNING MODEL FOR THE ARMY

<title>ABSTRACT</title> <p>The current reliability growth planning model used by the US Army, the Planning Model for Projection Methodology (PM2), is insufficient for the needs of the Army. This paper will detail the limitations of PM2 that cause Army programs to develop reliability growth plans that incorporate unrealistic assumptions and often demand that infeasible levels of reliability be achieved. In addition to this, another reliability growth planning model being developed to address some of these limitations, the Bayesian Continuous Planning Model (BCPM), will be discussed along with its own limitations. This paper will also cover a third reliability growth planning model that is being developed which incorporates the advantageous features of PM2 and BCPM but replaces the unrealistic assumptions with more realistic and customizable ones. The internal workings of this new TARDEC developed simulation-based model will be delved into with a focus on the advantages this model holds over PM2 and BCPM.</p>

Authors

Publication Details

Journal
SAE technical papers on CD-ROM/SAE technical paper series
Published
2024-11-15
DOI
https://doi.org/10.4271/2024-01-3480
Citations
1
Primary Topic
Reliability and Maintenance Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

SIMULATION BASED RELIABILITY GROWTH PLANNING MODEL FOR THE ARMY

Daniel B. Kosinski
1 citations
SAE technical papers on CD-ROM/SAE technical paper series
Reliability and Maintenance Optimization
article

SIMULATION BASED RELIABILITY GROWTH PLANNING MODEL FOR THE ARMY

Daniel B. Kosinski
article en
1 citations

Abstract

<title>ABSTRACT</title> <p>The current reliability growth planning model used by the US Army, the Planning Model for Projection Methodology (PM2), is insufficient for the needs of the Army. This paper will detail the limitations of PM2 that cause Army programs to develop reliability growth plans that incorporate unrealistic assumptions and often demand that infeasible levels of reliability be achieved. In addition to this, another reliability growth planning model being developed to address some of these limitations, the Bayesian Continuous Planning Model (BCPM), will be discussed along with its own limitations. This paper will also cover a third reliability growth planning model that is being developed which incorporates the advantageous features of PM2 and BCPM but replaces the unrealistic assumptions with more realistic and customizable ones. The internal workings of this new TARDEC developed simulation-based model will be delved into with a focus on the advantages this model holds over PM2 and BCPM.</p>

SAE technical papers on CD-ROM/SAE technical paper seriesVol. 1
Sustainable cities and communities
Openalex Percentile: Top 100%
Reliability and Maintenance Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.