Flexible job-shop scheduling considering human performance fluctuations
In production, product-related error costs can be reduced by focusing on human production factors, such as considering human performance fluctuations during the day, when production planning with respect to job-shop scheduling. In this article, the flexible job-shop scheduling problem is extended by considering product-related error costs and logistic costs. Product-related error costs are increased by over stressing the operative workers. Logistic costs are based on work in process and throughput time. This cost-based definition enables a production plan to be simultaneously optimized in respect of both error and logistic costs. The product-related error costs and flexible job-shop scheduling problem are described mathematically and a memetic algorithm is also presented as an approach. Within the memetic algorithm, the evolutionary process is supplemented with a local search procedure to improve the ability of solutions and repair procedures to rectify infeasible solutions. The influence of product-related error costs on the total costs of a produc-tion plan, throughput and job waiting times within job-shop scheduling is presented.
Authors
- Henrik Prinzhorn
- Christian Böning
- Malte Stonis (ORCID: https://orcid.org/0000-0001-5957-3469)
Institutions
- Institut fuer Integrierte Produktion Hannover (Germany) (DE)
Publication Details
- Journal
- Logistics Journal Proceedings
- Published
- 2024-12-16
- DOI
- https://doi.org/10.2195/lj_notrev_prinzhorn_en_201710_01
- Primary Topic
- Scheduling and Optimization Algorithms
- Type
- article
- Field-Weighted Citation Impact
- 0.00