Groundwater inflow problems in tunneling at west leg interceptor contract 3, Cleveland, Ohio

West Leg Interceptor Contract 3 is part of a new sanitary sewer system in the southwest suburbs of Cleveland. The mainline tunnel was excavated through sandstones and shales by a shielded TBM equipped with disc cutters and grippers. Groundwater inflows in three tunnel reaches caused major concerns and resulted in claims for differing site conditions. At Stations 202+50 to 200+50, the tunnel crossing of the Rocky River had special challenges during both design and construction. An anchored concrete cap and a grout curtain were placed prior to tunneling. Gasketed liner plate was used as the tunnel support. At Stations 197+90 to 183 + 00, seepage from the overlying sandstone aquifer and into weathered shale resulted in bearing failures at the TBM grippers. A change in support from rock bolts to ribs & lagging was required at three locations to allow continued advance of the TBM. At Stations 212+00 to 278 + 00, high water inflows from open fractures and bedding planes in hard, massive sandstone washed cuttings from the face. Silt and fine sand accumulated on the TBM trailing gear and on the track. Hand mucking and additional pumping effort were necessary to avoid damage to the electric motors and to allow passage of muck trains.

Authors

Institutions

Publication Details

Published
2026-02-18
DOI
https://doi.org/10.1201/9781003761365-44
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Groundwater inflow problems in tunneling at west leg interceptor contract 3, Cleveland, Ohio

Thomas R. Scotese, Arthur O. Paeth, Michael J. Miller
Tunneling and Rock Mechanics
article

Groundwater inflow problems in tunneling at west leg interceptor contract 3, Cleveland, Ohio

Thomas R. Scotese, Arthur O. Paeth, Michael J. Miller
article en

Abstract

West Leg Interceptor Contract 3 is part of a new sanitary sewer system in the southwest suburbs of Cleveland. The mainline tunnel was excavated through sandstones and shales by a shielded TBM equipped with disc cutters and grippers. Groundwater inflows in three tunnel reaches caused major concerns and resulted in claims for differing site conditions. At Stations 202+50 to 200+50, the tunnel crossing of the Rocky River had special challenges during both design and construction. An anchored concrete cap and a grout curtain were placed prior to tunneling. Gasketed liner plate was used as the tunnel support. At Stations 197+90 to 183 + 00, seepage from the overlying sandstone aquifer and into weathered shale resulted in bearing failures at the TBM grippers. A change in support from rock bolts to ribs & lagging was required at three locations to allow continued advance of the TBM. At Stations 212+00 to 278 + 00, high water inflows from open fractures and bedding planes in hard, massive sandstone washed cuttings from the face. Silt and fine sand accumulated on the TBM trailing gear and on the track. Hand mucking and additional pumping effort were necessary to avoid damage to the electric motors and to allow passage of muck trains.

Cleveland Metropolitan School District (US), Woodward (United States) (US)
Clean water and sanitation
Openalex Percentile: Top 97%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Groundwater inflow problems in tunneling at west leg interceptor contract 3, Cleveland, Ohio — Thomas R. Scotese, Arthur O. Paeth, et al. · (2026) | TGRS Research Map | TGRS