Monitoring and control of slope stability during construction of a shallow tunnel in a complex formation

The problem discussed involves the stability of the slope on one side of the Riola Tunnel in a weak and complex formation. Immediately following the excavation of the heading, the potential for slope failure was indicated by the increased aperture of the cracks in the houses abutting the slope. The stability analyses were made and a two-stage stabilization scheme for the slope was proposed; the first stage was carried out. The effectiveness of the support scheme was verified by continuous monitoring during and after subsequent bench excavation. Le problème discuté concerne la stabilité du versant d’une paroi du tunnel Riola, dans une formation faible et complexe. Immédiatement après le creusement de la demi-section supérieure, l’on s’apercevait du risque de failure du versant, à cause de l’élargissement croissant des fissures des maisons adossées au versant. On a procédé à l’analyse de la stabilité et on a proposé un schéma de stabilisation en deux phases; la première a été réalisée. L’efficacité du schéma de soutènement est continuellement vérifiée au moyen de monitorages pendant et après l’ultérieure excavation du stross. Beim besprochenen Problem handelt es sich um die Stabilität des Hangs auf der einen Seite des Riola-Tunnels an einem schwacher und komplexen Bauabschnitt. Gleich nach dem Asuhub des Stolles wurde die Möglichkeit einer Stoning des Hangs aufgrund einer zunehmenden Erweiterung des Risse in den Häusern am Hang sichtbar. Es wurden Stabilitätsanalyses angefertigt und ein zweistufiger Stabilisierungsplan für den Hang vorgeschlagen; die erste Stufe wurde ausgefuhrt. Die Wirksamkeit des Stützplans wurde durch eine ständige Überwachung während und nach dem Aushub der folgenden Erdstufen überprüft.

Authors

Publication Details

Published
2026-02-12
DOI
https://doi.org/10.1201/9781003761389-94
Primary Topic
Geotechnical Engineering and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Monitoring and control of slope stability during construction of a shallow tunnel in a complex formation

Shishuo Xu, M. Lanciani, P Grasso, A. Mahtab et al.
Geotechnical Engineering and Analysis
article

Monitoring and control of slope stability during construction of a shallow tunnel in a complex formation

Shishuo Xu, M. Lanciani, P Grasso, A. Mahtab, L. Brino
article en

Abstract

The problem discussed involves the stability of the slope on one side of the Riola Tunnel in a weak and complex formation. Immediately following the excavation of the heading, the potential for slope failure was indicated by the increased aperture of the cracks in the houses abutting the slope. The stability analyses were made and a two-stage stabilization scheme for the slope was proposed; the first stage was carried out. The effectiveness of the support scheme was verified by continuous monitoring during and after subsequent bench excavation. Le problème discuté concerne la stabilité du versant d’une paroi du tunnel Riola, dans une formation faible et complexe. Immédiatement après le creusement de la demi-section supérieure, l’on s’apercevait du risque de failure du versant, à cause de l’élargissement croissant des fissures des maisons adossées au versant. On a procédé à l’analyse de la stabilité et on a proposé un schéma de stabilisation en deux phases; la première a été réalisée. L’efficacité du schéma de soutènement est continuellement vérifiée au moyen de monitorages pendant et après l’ultérieure excavation du stross. Beim besprochenen Problem handelt es sich um die Stabilität des Hangs auf der einen Seite des Riola-Tunnels an einem schwacher und komplexen Bauabschnitt. Gleich nach dem Asuhub des Stolles wurde die Möglichkeit einer Stoning des Hangs aufgrund einer zunehmenden Erweiterung des Risse in den Häusern am Hang sichtbar. Es wurden Stabilitätsanalyses angefertigt und ein zweistufiger Stabilisierungsplan für den Hang vorgeschlagen; die erste Stufe wurde ausgefuhrt. Die Wirksamkeit des Stützplans wurde durch eine ständige Überwachung während und nach dem Aushub der folgenden Erdstufen überprüft.

Sustainable cities and communities
Openalex Percentile: Top 97%
Geotechnical Engineering and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Monitoring and control of slope stability during construction of a shallow tunnel in a complex formation — Shishuo Xu, M. Lanciani, et al. · (2026) | TGRS Research Map | TGRS