Development of a socket inspection device

The construction of the elevated section of the West Gate Freeway (South Melbourne Section) involves the construction of 420 bored cast-in-place piles socketed into variably-weathered Silurian mudstone or Tertiary basalt rock (Valentine, 1979). The rock sockets in mudstone are excavated using three methods:

Authors

Institutions

Publication Details

Published
2026-01-09
DOI
https://doi.org/10.1201/9781003762690-28
Citations
2
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of a socket inspection device

J C Holden
2 citations
Drilling and Well Engineering
article

Development of a socket inspection device

J C Holden
article en
2 citations

Abstract

The construction of the elevated section of the West Gate Freeway (South Melbourne Section) involves the construction of 420 bored cast-in-place piles socketed into variably-weathered Silurian mudstone or Tertiary basalt rock (Valentine, 1979). The rock sockets in mudstone are excavated using three methods:

Vol. 2
VicRoads (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 100%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Development of a socket inspection device — J C Holden · (2026) | TGRS Research Map | TGRS