ORBCOMM Satellites Launch and Initial Flight Operations

The ORBCOMM Flight Model (FM) 1&2 and MicroLab I spacecraft were flawlessly launched by a Pegasus® vehicle on April 3, 1995. Following sequential separation from the Pegasus third stage, the spacecraft deployed solar arrays and antenna assemblies, autonomously de-tumbled, and acquired sun-nadir attitude. Both ORBCOMM spacecraft connected automatically with a Gateway Earth Station (GES) about 8 hours after launch. Nominal early passes focused on post-launch housekeeping tasks. However, a series of anomalies developed: including loss of gateway uplink, gateway downlink transmitter oscillation, poor GPS position fixing, subscriber downlink transmitter lock-up, and several software problems. All these conditions were unique to the space environment or resulted from minor design changes or oversights. Eventually the spacecraft were recovered from their outages and the causes conclusively determined. Throughout this time, the spacecraft housekeeping subsystems continued to function nominally with a high degree of autonomy. Following maneuvers and testing, the satellites were delivered to ORBCOMM Global on August 3, 1995.

Authors

Institutions

Publication Details

Journal
Digital Commons - USU (Utah State University)
Published
2025-08-25
DOI
https://doi.org/10.26077/pwxq-yn55
Citations
2
Primary Topic
Spacecraft Design and Technology
Type
article
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ORBCOMM Satellites Launch and Initial Flight Operations

David Steffy
2 citations
Digital Commons - USU (Utah State University)
Spacecraft Design and Technology
article

ORBCOMM Satellites Launch and Initial Flight Operations

David Steffy
article en
2 citations

Abstract

The ORBCOMM Flight Model (FM) 1&2 and MicroLab I spacecraft were flawlessly launched by a Pegasus® vehicle on April 3, 1995. Following sequential separation from the Pegasus third stage, the spacecraft deployed solar arrays and antenna assemblies, autonomously de-tumbled, and acquired sun-nadir attitude. Both ORBCOMM spacecraft connected automatically with a Gateway Earth Station (GES) about 8 hours after launch. Nominal early passes focused on post-launch housekeeping tasks. However, a series of anomalies developed: including loss of gateway uplink, gateway downlink transmitter oscillation, poor GPS position fixing, subscriber downlink transmitter lock-up, and several software problems. All these conditions were unique to the space environment or resulted from minor design changes or oversights. Eventually the spacecraft were recovered from their outages and the causes conclusively determined. Throughout this time, the spacecraft housekeeping subsystems continued to function nominally with a high degree of autonomy. Following maneuvers and testing, the satellites were delivered to ORBCOMM Global on August 3, 1995.

Digital Commons - USU (Utah State University)
Northrop Grumman (United States) (US)
Spacecraft Design and Technology
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines