Directional core drilling for the Metro West Water Supply Tunnel

The Massachusetts Water Resources Authority (MWRA) is using directional core drilling technology from the mining industry and Norwegian tunneling practice to determine geologic conditions along a proposed rock tunnel alignment. The directional core drilling system is in use on the most geologically complex section of the MWRA’s 28.3 km (17.6 mile) long MetroWest Water Supply Tunnel (MWWST) in Weston, Massachusetts. A 533 m (1750 ft) long boring is being drilled from the ground surface at a 30 degree angle from the horizontal. Specially designed coring tools are being used to “kick”, or bend the boring to the horizontal and parallel to the crown of the future tunnel at a depth of 63 m (207 ft). Continuous rock core is being recovered along the entire length of a portion of the MWWST alignment where faulted ground and soft rock alteration are known to occur. The core will be used to predict anticipated tunneling conditions and complete design work for the future MWWST contract CP-3A, the Eastern Tunnel Segment. Evaluation of the core will aid in the refinement of a grouting program and the decision of whether a tunnel boring machine may be used, resulting in possible cost savings over mining the tunnel by the conventional drill and blast method.

Authors

Institutions

Publication Details

Published
2026-01-21
DOI
https://doi.org/10.1201/9781003761792-13
Primary Topic
Tunneling and Rock Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Directional core drilling for the Metro West Water Supply Tunnel

J Kaplin, R. B. Dowdell, Tokle
Tunneling and Rock Mechanics
article

Directional core drilling for the Metro West Water Supply Tunnel

J Kaplin, R. B. Dowdell, Tokle
article en

Abstract

The Massachusetts Water Resources Authority (MWRA) is using directional core drilling technology from the mining industry and Norwegian tunneling practice to determine geologic conditions along a proposed rock tunnel alignment. The directional core drilling system is in use on the most geologically complex section of the MWRA’s 28.3 km (17.6 mile) long MetroWest Water Supply Tunnel (MWWST) in Weston, Massachusetts. A 533 m (1750 ft) long boring is being drilled from the ground surface at a 30 degree angle from the horizontal. Specially designed coring tools are being used to “kick”, or bend the boring to the horizontal and parallel to the crown of the future tunnel at a depth of 63 m (207 ft). Continuous rock core is being recovered along the entire length of a portion of the MWWST alignment where faulted ground and soft rock alteration are known to occur. The core will be used to predict anticipated tunneling conditions and complete design work for the future MWWST contract CP-3A, the Eastern Tunnel Segment. Evaluation of the core will aid in the refinement of a grouting program and the decision of whether a tunnel boring machine may be used, resulting in possible cost savings over mining the tunnel by the conventional drill and blast method.

BC Hydro (Canada) (CA)
Clean water and sanitation
Openalex Percentile: Top 100%
Tunneling and Rock Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Directional core drilling for the Metro West Water Supply Tunnel — J Kaplin, R. B. Dowdell, et al. · (2026) | TGRS Research Map | TGRS